The CMS GE1/1 system was installed in October 2020 as part of the CMS endcap muon system upgrades for the high-luminosity LHC. Since then, GE1/1 has been commissioned, and it is now participating in the CMS data taking of the LHC Run 3. The 144 GE1/1 detectors are read-out by the VFAT3 chip, which c...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/18/02/C02020 http://cds.cern.ch/record/2839787 |
_version_ | 1780975989893890048 |
---|---|
author | Petre, Laurent |
author_facet | Petre, Laurent |
author_sort | Petre, Laurent |
collection | CERN |
description | The CMS GE1/1 system was installed in October 2020 as part of the CMS endcap muon system upgrades for the high-luminosity LHC. Since then, GE1/1 has been commissioned, and it is now participating in the CMS data taking of the LHC Run 3. The 144 GE1/1 detectors are read-out by the VFAT3 chip, which communicates with the $\mu$TCA backend through the versatile link. Each detector is equipped with 24 VFAT3, 3 GBTx, 3 VTRx, 2 VTTx, and a Virtex-6 FPGA. In this contribution, we present the commissioning and the running experience acquired over 2 years of operations with the CMS GE1/1 system. The electronics performance results are presented with an emphasis on the main issues encountered and how they have been addressed. We also briefly discuss the status of the future GE2/1 and ME0 GEM stations. |
id | cern-2839787 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2022 |
record_format | invenio |
spelling | cern-28397872023-06-12T07:40:14Zdoi:10.1088/1748-0221/18/02/C02020http://cds.cern.ch/record/2839787engPetre, LaurentCommissioning and running experience with the CMS GE1/1 systemDetectors and Experimental TechniquesThe CMS GE1/1 system was installed in October 2020 as part of the CMS endcap muon system upgrades for the high-luminosity LHC. Since then, GE1/1 has been commissioned, and it is now participating in the CMS data taking of the LHC Run 3. The 144 GE1/1 detectors are read-out by the VFAT3 chip, which communicates with the $\mu$TCA backend through the versatile link. Each detector is equipped with 24 VFAT3, 3 GBTx, 3 VTRx, 2 VTTx, and a Virtex-6 FPGA. In this contribution, we present the commissioning and the running experience acquired over 2 years of operations with the CMS GE1/1 system. The electronics performance results are presented with an emphasis on the main issues encountered and how they have been addressed. We also briefly discuss the status of the future GE2/1 and ME0 GEM stations.CMS-CR-2022-210oai:cds.cern.ch:28397872022-10-21 |
spellingShingle | Detectors and Experimental Techniques Petre, Laurent Commissioning and running experience with the CMS GE1/1 system |
title | Commissioning and running experience with the CMS GE1/1 system |
title_full | Commissioning and running experience with the CMS GE1/1 system |
title_fullStr | Commissioning and running experience with the CMS GE1/1 system |
title_full_unstemmed | Commissioning and running experience with the CMS GE1/1 system |
title_short | Commissioning and running experience with the CMS GE1/1 system |
title_sort | commissioning and running experience with the cms ge1/1 system |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.1088/1748-0221/18/02/C02020 http://cds.cern.ch/record/2839787 |
work_keys_str_mv | AT petrelaurent commissioningandrunningexperiencewiththecmsge11system |