Commissioning and running experience with the CMS GE1/1 system

The CMS GE1/1 system was installed in October 2020 as part of the CMS endcap muon system upgrades for the high-luminosity LHC. Since then, GE1/1 has been commissioned, and it is now participating in the CMS data taking of the LHC Run 3. The 144 GE1/1 detectors are read-out by the VFAT3 chip, which c...

Descripción completa

Detalles Bibliográficos
Autor principal: Petre, Laurent
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/18/02/C02020
http://cds.cern.ch/record/2839787
_version_ 1780975989893890048
author Petre, Laurent
author_facet Petre, Laurent
author_sort Petre, Laurent
collection CERN
description The CMS GE1/1 system was installed in October 2020 as part of the CMS endcap muon system upgrades for the high-luminosity LHC. Since then, GE1/1 has been commissioned, and it is now participating in the CMS data taking of the LHC Run 3. The 144 GE1/1 detectors are read-out by the VFAT3 chip, which communicates with the $\mu$TCA backend through the versatile link. Each detector is equipped with 24 VFAT3, 3 GBTx, 3 VTRx, 2 VTTx, and a Virtex-6 FPGA. In this contribution, we present the commissioning and the running experience acquired over 2 years of operations with the CMS GE1/1 system. The electronics performance results are presented with an emphasis on the main issues encountered and how they have been addressed. We also briefly discuss the status of the future GE2/1 and ME0 GEM stations.
id cern-2839787
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28397872023-06-12T07:40:14Zdoi:10.1088/1748-0221/18/02/C02020http://cds.cern.ch/record/2839787engPetre, LaurentCommissioning and running experience with the CMS GE1/1 systemDetectors and Experimental TechniquesThe CMS GE1/1 system was installed in October 2020 as part of the CMS endcap muon system upgrades for the high-luminosity LHC. Since then, GE1/1 has been commissioned, and it is now participating in the CMS data taking of the LHC Run 3. The 144 GE1/1 detectors are read-out by the VFAT3 chip, which communicates with the $\mu$TCA backend through the versatile link. Each detector is equipped with 24 VFAT3, 3 GBTx, 3 VTRx, 2 VTTx, and a Virtex-6 FPGA. In this contribution, we present the commissioning and the running experience acquired over 2 years of operations with the CMS GE1/1 system. The electronics performance results are presented with an emphasis on the main issues encountered and how they have been addressed. We also briefly discuss the status of the future GE2/1 and ME0 GEM stations.CMS-CR-2022-210oai:cds.cern.ch:28397872022-10-21
spellingShingle Detectors and Experimental Techniques
Petre, Laurent
Commissioning and running experience with the CMS GE1/1 system
title Commissioning and running experience with the CMS GE1/1 system
title_full Commissioning and running experience with the CMS GE1/1 system
title_fullStr Commissioning and running experience with the CMS GE1/1 system
title_full_unstemmed Commissioning and running experience with the CMS GE1/1 system
title_short Commissioning and running experience with the CMS GE1/1 system
title_sort commissioning and running experience with the cms ge1/1 system
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1088/1748-0221/18/02/C02020
http://cds.cern.ch/record/2839787
work_keys_str_mv AT petrelaurent commissioningandrunningexperiencewiththecmsge11system