Commissioning and running experience with the CMS GE1/1 system
The CMS GE1/1 system was installed in October 2020 as part of the CMS endcap muon system upgrades for the high-luminosity LHC. Since then, GE1/1 has been commissioned, and it is now participating in the CMS data taking of the LHC Run 3. The 144 GE1/1 detectors are read-out by the VFAT3 chip, which c...
Autor principal: | Petre, Laurent |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/18/02/C02020 http://cds.cern.ch/record/2839787 |
Ejemplares similares
-
Commissioning of the CMS experiment and the cosmic run at four Tesla
por: Chatrchyan, S, et al.
Publicado: (2009) -
Commissioning of the first chambers of the CMS GE1/1 muon station
por: Ressegotti, Martina
Publicado: (2017) -
The ALICE Inner Tracking System: Commissioning and running experience
por: Manzari, Vito
Publicado: (2010) -
Status and commissioning of the CMS experiment
por: DOBRZYNSKI, Ludwik
Publicado: (2007) -
Status and Commissioning of the CMS Experiment
por: Wulz, Claudia-Elisabeth
Publicado: (2007)