Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2

During the second run of the Large Hadron Collider (LHC) between 2015 and 2018, significant beam induced heat loads have been observed on the beam screens circuits impacting the cryogenic system capacity, mainly due to the electron clouds generated by the beams. To validate these measurements and to...

Descripción completa

Detalles Bibliográficos
Autores principales: Bradu, B, Brodzinski, K, Casas-Cubillos, J, Delikaris, D, Deschamps, J B, Le Naour, S, Pezzetti, M, Tavian, L, Tovar, A, Sisti, M, Ph Tock, J, Vauthier, N
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1757-899X/1240/1/012043
http://cds.cern.ch/record/2839958
_version_ 1780976002823880704
author Bradu, B
Brodzinski, K
Casas-Cubillos, J
Delikaris, D
Deschamps, J B
Le Naour, S
Pezzetti, M
Tavian, L
Tovar, A
Sisti, M
Ph Tock, J
Vauthier, N
author_facet Bradu, B
Brodzinski, K
Casas-Cubillos, J
Delikaris, D
Deschamps, J B
Le Naour, S
Pezzetti, M
Tavian, L
Tovar, A
Sisti, M
Ph Tock, J
Vauthier, N
author_sort Bradu, B
collection CERN
description During the second run of the Large Hadron Collider (LHC) between 2015 and 2018, significant beam induced heat loads have been observed on the beam screens circuits impacting the cryogenic system capacity, mainly due to the electron clouds generated by the beams. To validate these measurements and to obtain precise heat load assessments and comparison with preliminary calculations based on existing hardware equipment at selected locations, it was decided to add new cryogenic instrumentation around the machine. In total, 23 Coriolis flowmeters (cold conditions), 4 thermal flowmeters (room temperature conditions) and 58 Cernox thermometers have been installed and commissioned between 2019 and 2021 during the so-called long shutdown 2 (LS2). This paper presents an overview of this project, including the commissioning of these instruments and confirming at first stage the original heat load estimations.
id cern-2839958
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28399582022-11-09T23:37:07Zdoi:10.1088/1757-899X/1240/1/012043http://cds.cern.ch/record/2839958engBradu, BBrodzinski, KCasas-Cubillos, JDelikaris, DDeschamps, J BLe Naour, SPezzetti, MTavian, LTovar, ASisti, MPh Tock, JVauthier, NBeam induced heat load instrumentation installed in LHC during the Long Shutdown 2Accelerators and Storage RingsDuring the second run of the Large Hadron Collider (LHC) between 2015 and 2018, significant beam induced heat loads have been observed on the beam screens circuits impacting the cryogenic system capacity, mainly due to the electron clouds generated by the beams. To validate these measurements and to obtain precise heat load assessments and comparison with preliminary calculations based on existing hardware equipment at selected locations, it was decided to add new cryogenic instrumentation around the machine. In total, 23 Coriolis flowmeters (cold conditions), 4 thermal flowmeters (room temperature conditions) and 58 Cernox thermometers have been installed and commissioned between 2019 and 2021 during the so-called long shutdown 2 (LS2). This paper presents an overview of this project, including the commissioning of these instruments and confirming at first stage the original heat load estimations.oai:cds.cern.ch:28399582022
spellingShingle Accelerators and Storage Rings
Bradu, B
Brodzinski, K
Casas-Cubillos, J
Delikaris, D
Deschamps, J B
Le Naour, S
Pezzetti, M
Tavian, L
Tovar, A
Sisti, M
Ph Tock, J
Vauthier, N
Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2
title Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2
title_full Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2
title_fullStr Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2
title_full_unstemmed Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2
title_short Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2
title_sort beam induced heat load instrumentation installed in lhc during the long shutdown 2
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1088/1757-899X/1240/1/012043
http://cds.cern.ch/record/2839958
work_keys_str_mv AT bradub beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2
AT brodzinskik beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2
AT casascubillosj beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2
AT delikarisd beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2
AT deschampsjb beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2
AT lenaours beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2
AT pezzettim beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2
AT tavianl beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2
AT tovara beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2
AT sistim beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2
AT phtockj beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2
AT vauthiern beaminducedheatloadinstrumentationinstalledinlhcduringthelongshutdown2