Cargando…
Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2
During the second run of the Large Hadron Collider (LHC) between 2015 and 2018, significant beam induced heat loads have been observed on the beam screens circuits impacting the cryogenic system capacity, mainly due to the electron clouds generated by the beams. To validate these measurements and to...
Autores principales: | Bradu, B, Brodzinski, K, Casas-Cubillos, J, Delikaris, D, Deschamps, J B, Le Naour, S, Pezzetti, M, Tavian, L, Tovar, A, Sisti, M, Ph Tock, J, Vauthier, N |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1757-899X/1240/1/012043 http://cds.cern.ch/record/2839958 |
Ejemplares similares
-
Automatic LHC accelerator warm-up and cool-down experience during the Long Shutdown 2
por: Bradu, B, et al.
Publicado: (2022) -
Heat load profile estimates on LHC beam screens by thermal transient analysis
por: Bradu, B, et al.
Publicado: (2019) -
Quality Assurance of LHC Cryogenic Instrumentation during Installation and Commissioning
por: Lopez Lorente, A, et al.
Publicado: (2008) -
Adaptation of the Cryogenic System Capacity for the LHC Dynamic Heat Load - Operational Experience
por: Brodzinski, Krzysztof, et al.
Publicado: (2018) -
Main Consolidations and Improvements of the Control System and Instrumentation for the LHC Cryogenics
por: Fluder, C, et al.
Publicado: (2013)