Cargando…
Automatic LHC accelerator warm-up and cool-down experience during the Long Shutdown 2
During the so-called Long Shutdown 2 (LS2), the Large Hadron Collider (LHC) has been entirely warmed-up in 2019 and cooled-down in 2020/2021 after an important maintenance period. For the first time, these complex and delicate operations have been performed in an automatic way, using a new control l...
Autores principales: | Bradu, B, Brodzinski, K, Ferlin, G, Pezzetti, M, Tovar, A |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1757-899X/1240/1/012119 http://cds.cern.ch/record/2839959 |
Ejemplares similares
-
Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2
por: Bradu, B, et al.
Publicado: (2022) -
Cryogenic management of the LHC run 2 dynamic heat loads
por: Bradu, B, et al.
Publicado: (2020) -
Adaptation of the Cryogenic System Capacity for the LHC Dynamic Heat Load - Operational Experience
por: Brodzinski, Krzysztof, et al.
Publicado: (2018) -
How does a cryogenic system cope with e-cloud induced heat load?
por: Bradu, B, et al.
Publicado: (2020) -
Liquid helium level regulation improvement in the LHC electrical distribution feedboxes
por: Bradu, B, et al.
Publicado: (2022)