Cargando…

Assessment of the operation safety margin of the HL-LHC superconducting recombination Dipole D2 in case of helium filling failure

After the successful completion of the cryogenic performance tests of the He II heat exchanger prototype for the D2 recombination dipole of the future HL-LHC project at CERN, specific measurements were performed to determine the operation safety margin in case of abnormal operating conditions. This...

Descripción completa

Detalles Bibliográficos
Autores principales: Rousset, B, Bancel, F, Besson, N, Bon-Mardion, M, Claudet, S, Goy, T, Millet, F, Nivelon, P, Perin, A
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1757-899X/1240/1/012121
http://cds.cern.ch/record/2839977