Cargando…
Procedures followed to optimize the 500 MeV e+ beam during the 1988 start-up in WK 12
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1988
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2840064 |
_version_ | 1780976020405354496 |
---|---|
author | Frammery, B Madsen, J H B Potier J P Rinolfi, L |
author_facet | Frammery, B Madsen, J H B Potier J P Rinolfi, L |
author_sort | Frammery, B |
collection | CERN |
id | cern-2840064 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1988 |
record_format | invenio |
spelling | cern-28400642023-08-18T07:29:15Zhttp://cds.cern.ch/record/2840064engFrammery, BMadsen, J H BPotier J PRinolfi, LProcedures followed to optimize the 500 MeV e+ beam during the 1988 start-up in WK 12Accelerators and Storage RingsCERN-PS-LPI-Note-88-02PS-LPI-Note-88-02oai:cds.cern.ch:28400641988-04-08 |
spellingShingle | Accelerators and Storage Rings Frammery, B Madsen, J H B Potier J P Rinolfi, L Procedures followed to optimize the 500 MeV e+ beam during the 1988 start-up in WK 12 |
title | Procedures followed to optimize the 500 MeV e+ beam during the 1988 start-up in WK 12 |
title_full | Procedures followed to optimize the 500 MeV e+ beam during the 1988 start-up in WK 12 |
title_fullStr | Procedures followed to optimize the 500 MeV e+ beam during the 1988 start-up in WK 12 |
title_full_unstemmed | Procedures followed to optimize the 500 MeV e+ beam during the 1988 start-up in WK 12 |
title_short | Procedures followed to optimize the 500 MeV e+ beam during the 1988 start-up in WK 12 |
title_sort | procedures followed to optimize the 500 mev e+ beam during the 1988 start-up in wk 12 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2840064 |
work_keys_str_mv | AT frammeryb proceduresfollowedtooptimizethe500mevebeamduringthe1988startupinwk12 AT madsenjhb proceduresfollowedtooptimizethe500mevebeamduringthe1988startupinwk12 AT potierjp proceduresfollowedtooptimizethe500mevebeamduringthe1988startupinwk12 AT rinolfil proceduresfollowedtooptimizethe500mevebeamduringthe1988startupinwk12 |