Cargando…
Procedures followed to optimize the 500 MeV e+ beam during the 1988 start-up in WK 12
Autores principales: | Frammery, B, Madsen, J H B, Potier J P, Rinolfi, L |
---|---|
Lenguaje: | eng |
Publicado: |
1988
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2840064 |
Ejemplares similares
-
First micro-bunch measurements in EPA as isochronous ring at 500 MeV
por: Corsini, R, et al.
Publicado: (1999) -
Electromagnetic Shower Profile Measurements in Iron with 500 MeV Electrons
por: Akchurin, Nural, et al.
Publicado: (1999) -
A New Model for a 500 MeV Beam Line at TRIUMF
por: Kaminski, J
Publicado: (2001) -
A Monoergetic Polarized Neutron Beam from 200 to 500 MeV
por: Amsler, C, et al.
Publicado: (1978) -
Injection and trapping of the beam at 800 MeV in the CPS
por: Boussard, D, et al.
Publicado: (1974)