Programmed Stops Coordination: from Preparation to Completion

The exploitation of the CERN accelerator complex requires programmed stops of the operation, to execute various activities as standard maintenances, upgrades, consolidations and projects implementations. The Sec-ond Long Shutdown (LS2) of the LHC and its Injectors started in December 2018 and was co...

Descripción completa

Detalles Bibliográficos
Autores principales: Vergara Fernandez, Estrella, Bernardini, Marzia, Chemli, Samy, Corso, Jean-Pierre, Coupard, Julie, Etheridge, John Robert, Grillot, Serge, Muttoni, Yvon, Nicquevert, Bertrand, Perrot, Anne-Laure, Tock, Jean-Philippe
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:http://cds.cern.ch/record/2842137
_version_ 1780976230956269568
author Vergara Fernandez, Estrella
Bernardini, Marzia
Chemli, Samy
Corso, Jean-Pierre
Coupard, Julie
Etheridge, John Robert
Grillot, Serge
Muttoni, Yvon
Nicquevert, Bertrand
Perrot, Anne-Laure
Tock, Jean-Philippe
author_facet Vergara Fernandez, Estrella
Bernardini, Marzia
Chemli, Samy
Corso, Jean-Pierre
Coupard, Julie
Etheridge, John Robert
Grillot, Serge
Muttoni, Yvon
Nicquevert, Bertrand
Perrot, Anne-Laure
Tock, Jean-Philippe
author_sort Vergara Fernandez, Estrella
collection CERN
description The exploitation of the CERN accelerator complex requires programmed stops of the operation, to execute various activities as standard maintenances, upgrades, consolidations and projects implementations. The Sec-ond Long Shutdown (LS2) of the LHC and its Injectors started in December 2018 and was completed by the end of 2020 for the Injectors and early 2022 for the Large Hadron Collider (LHC). A huge number of activities were performed during this period, with challenges at various levels, from technical, to organizational and managerial. This paper presents the coordination of the Programmed Stops of the CERN accelerator complex, within the Accelerator Coordination & Engineering (EN-ACE) Group for the LHC and its injectors, from the preparation process to the completion of these periods. It takes the recent LS2 as a reference, and it highlights key points of success and lessons learnt in terms of general coordination, quality assurance, configuration and lay-out management, spatial integration, planning and scheduling, operational safety, logistics and worksite coordination. It introduces the preparation of the Run 3 Programmed Stops coordination based on the successful LS2 methodology.
id cern-2842137
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28421372022-11-25T22:47:07Zhttp://cds.cern.ch/record/2842137engVergara Fernandez, EstrellaBernardini, MarziaChemli, SamyCorso, Jean-PierreCoupard, JulieEtheridge, John RobertGrillot, SergeMuttoni, YvonNicquevert, BertrandPerrot, Anne-LaureTock, Jean-PhilippeProgrammed Stops Coordination: from Preparation to CompletionEngineeringAccelerators and Storage RingsThe exploitation of the CERN accelerator complex requires programmed stops of the operation, to execute various activities as standard maintenances, upgrades, consolidations and projects implementations. The Sec-ond Long Shutdown (LS2) of the LHC and its Injectors started in December 2018 and was completed by the end of 2020 for the Injectors and early 2022 for the Large Hadron Collider (LHC). A huge number of activities were performed during this period, with challenges at various levels, from technical, to organizational and managerial. This paper presents the coordination of the Programmed Stops of the CERN accelerator complex, within the Accelerator Coordination & Engineering (EN-ACE) Group for the LHC and its injectors, from the preparation process to the completion of these periods. It takes the recent LS2 as a reference, and it highlights key points of success and lessons learnt in terms of general coordination, quality assurance, configuration and lay-out management, spatial integration, planning and scheduling, operational safety, logistics and worksite coordination. It introduces the preparation of the Run 3 Programmed Stops coordination based on the successful LS2 methodology. CERN-ACC-NOTE-2022-0036oai:cds.cern.ch:28421372022-10-11
spellingShingle Engineering
Accelerators and Storage Rings
Vergara Fernandez, Estrella
Bernardini, Marzia
Chemli, Samy
Corso, Jean-Pierre
Coupard, Julie
Etheridge, John Robert
Grillot, Serge
Muttoni, Yvon
Nicquevert, Bertrand
Perrot, Anne-Laure
Tock, Jean-Philippe
Programmed Stops Coordination: from Preparation to Completion
title Programmed Stops Coordination: from Preparation to Completion
title_full Programmed Stops Coordination: from Preparation to Completion
title_fullStr Programmed Stops Coordination: from Preparation to Completion
title_full_unstemmed Programmed Stops Coordination: from Preparation to Completion
title_short Programmed Stops Coordination: from Preparation to Completion
title_sort programmed stops coordination: from preparation to completion
topic Engineering
Accelerators and Storage Rings
url http://cds.cern.ch/record/2842137
work_keys_str_mv AT vergarafernandezestrella programmedstopscoordinationfrompreparationtocompletion
AT bernardinimarzia programmedstopscoordinationfrompreparationtocompletion
AT chemlisamy programmedstopscoordinationfrompreparationtocompletion
AT corsojeanpierre programmedstopscoordinationfrompreparationtocompletion
AT coupardjulie programmedstopscoordinationfrompreparationtocompletion
AT etheridgejohnrobert programmedstopscoordinationfrompreparationtocompletion
AT grillotserge programmedstopscoordinationfrompreparationtocompletion
AT muttoniyvon programmedstopscoordinationfrompreparationtocompletion
AT nicquevertbertrand programmedstopscoordinationfrompreparationtocompletion
AT perrotannelaure programmedstopscoordinationfrompreparationtocompletion
AT tockjeanphilippe programmedstopscoordinationfrompreparationtocompletion