Programmed Stops Coordination: from Preparation to Completion
The exploitation of the CERN accelerator complex requires programmed stops of the operation, to execute various activities as standard maintenances, upgrades, consolidations and projects implementations. The Sec-ond Long Shutdown (LS2) of the LHC and its Injectors started in December 2018 and was co...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2842137 |
_version_ | 1780976230956269568 |
---|---|
author | Vergara Fernandez, Estrella Bernardini, Marzia Chemli, Samy Corso, Jean-Pierre Coupard, Julie Etheridge, John Robert Grillot, Serge Muttoni, Yvon Nicquevert, Bertrand Perrot, Anne-Laure Tock, Jean-Philippe |
author_facet | Vergara Fernandez, Estrella Bernardini, Marzia Chemli, Samy Corso, Jean-Pierre Coupard, Julie Etheridge, John Robert Grillot, Serge Muttoni, Yvon Nicquevert, Bertrand Perrot, Anne-Laure Tock, Jean-Philippe |
author_sort | Vergara Fernandez, Estrella |
collection | CERN |
description | The exploitation of the CERN accelerator complex requires programmed stops of the operation, to execute various activities as standard maintenances, upgrades, consolidations and projects implementations. The Sec-ond Long Shutdown (LS2) of the LHC and its Injectors started in December 2018 and was completed by the end of 2020 for the Injectors and early 2022 for the Large Hadron Collider (LHC). A huge number of activities were performed during this period, with challenges at various levels, from technical, to organizational and managerial. This paper presents the coordination of the Programmed Stops of the CERN accelerator complex, within the Accelerator Coordination & Engineering (EN-ACE) Group for the LHC and its injectors, from the preparation process to the completion of these periods. It takes the recent LS2 as a reference, and it highlights key points of success and lessons learnt in terms of general coordination, quality assurance, configuration and lay-out management, spatial integration, planning and scheduling, operational safety, logistics and worksite coordination. It introduces the preparation of the Run 3 Programmed Stops coordination based on the successful LS2 methodology. |
id | cern-2842137 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2022 |
record_format | invenio |
spelling | cern-28421372022-11-25T22:47:07Zhttp://cds.cern.ch/record/2842137engVergara Fernandez, EstrellaBernardini, MarziaChemli, SamyCorso, Jean-PierreCoupard, JulieEtheridge, John RobertGrillot, SergeMuttoni, YvonNicquevert, BertrandPerrot, Anne-LaureTock, Jean-PhilippeProgrammed Stops Coordination: from Preparation to CompletionEngineeringAccelerators and Storage RingsThe exploitation of the CERN accelerator complex requires programmed stops of the operation, to execute various activities as standard maintenances, upgrades, consolidations and projects implementations. The Sec-ond Long Shutdown (LS2) of the LHC and its Injectors started in December 2018 and was completed by the end of 2020 for the Injectors and early 2022 for the Large Hadron Collider (LHC). A huge number of activities were performed during this period, with challenges at various levels, from technical, to organizational and managerial. This paper presents the coordination of the Programmed Stops of the CERN accelerator complex, within the Accelerator Coordination & Engineering (EN-ACE) Group for the LHC and its injectors, from the preparation process to the completion of these periods. It takes the recent LS2 as a reference, and it highlights key points of success and lessons learnt in terms of general coordination, quality assurance, configuration and lay-out management, spatial integration, planning and scheduling, operational safety, logistics and worksite coordination. It introduces the preparation of the Run 3 Programmed Stops coordination based on the successful LS2 methodology. CERN-ACC-NOTE-2022-0036oai:cds.cern.ch:28421372022-10-11 |
spellingShingle | Engineering Accelerators and Storage Rings Vergara Fernandez, Estrella Bernardini, Marzia Chemli, Samy Corso, Jean-Pierre Coupard, Julie Etheridge, John Robert Grillot, Serge Muttoni, Yvon Nicquevert, Bertrand Perrot, Anne-Laure Tock, Jean-Philippe Programmed Stops Coordination: from Preparation to Completion |
title | Programmed Stops Coordination: from Preparation to Completion |
title_full | Programmed Stops Coordination: from Preparation to Completion |
title_fullStr | Programmed Stops Coordination: from Preparation to Completion |
title_full_unstemmed | Programmed Stops Coordination: from Preparation to Completion |
title_short | Programmed Stops Coordination: from Preparation to Completion |
title_sort | programmed stops coordination: from preparation to completion |
topic | Engineering Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2842137 |
work_keys_str_mv | AT vergarafernandezestrella programmedstopscoordinationfrompreparationtocompletion AT bernardinimarzia programmedstopscoordinationfrompreparationtocompletion AT chemlisamy programmedstopscoordinationfrompreparationtocompletion AT corsojeanpierre programmedstopscoordinationfrompreparationtocompletion AT coupardjulie programmedstopscoordinationfrompreparationtocompletion AT etheridgejohnrobert programmedstopscoordinationfrompreparationtocompletion AT grillotserge programmedstopscoordinationfrompreparationtocompletion AT muttoniyvon programmedstopscoordinationfrompreparationtocompletion AT nicquevertbertrand programmedstopscoordinationfrompreparationtocompletion AT perrotannelaure programmedstopscoordinationfrompreparationtocompletion AT tockjeanphilippe programmedstopscoordinationfrompreparationtocompletion |