Cargando…
The GEM GE1/1 station of the CMS muon detector status, commissioning and operation in magnetic field.
During Run 3, the LHC will deliver instantaneous luminosity in the range $5\times10^{34} cm^{-2} s^{-1}$ to $7 \times 10^{34} cm^{-2} s^{-1}$. To cope with the high background rates and to improve the trigger capabilities in the forward region, the muon system of the CMS experiment has been upgraded...
Autor principal: | Mittal, Monika |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.414.0632 http://cds.cern.ch/record/2842396 |
Ejemplares similares
-
The GEM (GE1/1) station of the CMS muon detector status, commissioning and early performance studies
por: Simone, Federica Maria, et al.
Publicado: (2021) -
Commissioning results and operational experience of the first triple-GEM station of the CMS muon system
por: Ivone, Francesco
Publicado: (2022) -
Commissioning of the first chambers of the CMS GE1/1 muon station
por: Ressegotti, Martina
Publicado: (2017) -
GEM detectors for the CMS endcap muon system: status of three new detector stations
por: Verwilligen, Piet
Publicado: (2023) -
Status of the installation and commissioning of the first GEM station at the CMS experiment
por: Fallavollita, F, et al.
Publicado: (2020)