Run3 Installation Coordination

After reminding the mandate and the scope of the Run3 Installation Coordinator, the Run3 team members and their respective assignments will be present-ed. The methodology applied for the Run3 coordination will be explained and the priorities implementation will be shown. Based on the work carried ou...

Descripción completa

Detalles Bibliográficos
Autores principales: Tock, Jean-Philippe, Bedel, Cyrille Patrick, Bernardini, Marzia, Etheridge, John Robert, Fessia, Paolo, Lambert, Anna, Loertscher, Yves, Masterson, Raoul, Modena, Michele, Roesler, Stefan, Baltasar Dos Santos Pedrosa, Fernando, Steerenberg, Rende
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:http://cds.cern.ch/record/2842631
_version_ 1780976254625775616
author Tock, Jean-Philippe
Bedel, Cyrille Patrick
Bernardini, Marzia
Etheridge, John Robert
Fessia, Paolo
Lambert, Anna
Loertscher, Yves
Masterson, Raoul
Modena, Michele
Roesler, Stefan
Baltasar Dos Santos Pedrosa, Fernando
Steerenberg, Rende
author_facet Tock, Jean-Philippe
Bedel, Cyrille Patrick
Bernardini, Marzia
Etheridge, John Robert
Fessia, Paolo
Lambert, Anna
Loertscher, Yves
Masterson, Raoul
Modena, Michele
Roesler, Stefan
Baltasar Dos Santos Pedrosa, Fernando
Steerenberg, Rende
author_sort Tock, Jean-Philippe
collection CERN
description After reminding the mandate and the scope of the Run3 Installation Coordinator, the Run3 team members and their respective assignments will be present-ed. The methodology applied for the Run3 coordination will be explained and the priorities implementation will be shown. Based on the work carried out so far and on the results of the first Run3-LS3 PLAN exercise, the main interventions and challenges of the Run3 programmed stops, especially those linked to the anticipation of LS3 activities, will be underlined. Finally, the milestones will be integrated in the CERN accelerator complex long-term schedule following the methodology used to organise the Run2 programmed stops of the LHC and its injectors.
id cern-2842631
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28426312022-11-30T19:36:14Zhttp://cds.cern.ch/record/2842631engTock, Jean-PhilippeBedel, Cyrille PatrickBernardini, MarziaEtheridge, John RobertFessia, PaoloLambert, AnnaLoertscher, YvesMasterson, RaoulModena, MicheleRoesler, StefanBaltasar Dos Santos Pedrosa, FernandoSteerenberg, RendeRun3 Installation CoordinationEngineeringAccelerators and Storage RingsAfter reminding the mandate and the scope of the Run3 Installation Coordinator, the Run3 team members and their respective assignments will be present-ed. The methodology applied for the Run3 coordination will be explained and the priorities implementation will be shown. Based on the work carried out so far and on the results of the first Run3-LS3 PLAN exercise, the main interventions and challenges of the Run3 programmed stops, especially those linked to the anticipation of LS3 activities, will be underlined. Finally, the milestones will be integrated in the CERN accelerator complex long-term schedule following the methodology used to organise the Run2 programmed stops of the LHC and its injectors. CERN-ACC-NOTE-2022-0037oai:cds.cern.ch:28426312022-10-11
spellingShingle Engineering
Accelerators and Storage Rings
Tock, Jean-Philippe
Bedel, Cyrille Patrick
Bernardini, Marzia
Etheridge, John Robert
Fessia, Paolo
Lambert, Anna
Loertscher, Yves
Masterson, Raoul
Modena, Michele
Roesler, Stefan
Baltasar Dos Santos Pedrosa, Fernando
Steerenberg, Rende
Run3 Installation Coordination
title Run3 Installation Coordination
title_full Run3 Installation Coordination
title_fullStr Run3 Installation Coordination
title_full_unstemmed Run3 Installation Coordination
title_short Run3 Installation Coordination
title_sort run3 installation coordination
topic Engineering
Accelerators and Storage Rings
url http://cds.cern.ch/record/2842631
work_keys_str_mv AT tockjeanphilippe run3installationcoordination
AT bedelcyrillepatrick run3installationcoordination
AT bernardinimarzia run3installationcoordination
AT etheridgejohnrobert run3installationcoordination
AT fessiapaolo run3installationcoordination
AT lambertanna run3installationcoordination
AT loertscheryves run3installationcoordination
AT mastersonraoul run3installationcoordination
AT modenamichele run3installationcoordination
AT roeslerstefan run3installationcoordination
AT baltasardossantospedrosafernando run3installationcoordination
AT steerenbergrende run3installationcoordination