Run3 Installation Coordination
After reminding the mandate and the scope of the Run3 Installation Coordinator, the Run3 team members and their respective assignments will be present-ed. The methodology applied for the Run3 coordination will be explained and the priorities implementation will be shown. Based on the work carried ou...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2842631 |
_version_ | 1780976254625775616 |
---|---|
author | Tock, Jean-Philippe Bedel, Cyrille Patrick Bernardini, Marzia Etheridge, John Robert Fessia, Paolo Lambert, Anna Loertscher, Yves Masterson, Raoul Modena, Michele Roesler, Stefan Baltasar Dos Santos Pedrosa, Fernando Steerenberg, Rende |
author_facet | Tock, Jean-Philippe Bedel, Cyrille Patrick Bernardini, Marzia Etheridge, John Robert Fessia, Paolo Lambert, Anna Loertscher, Yves Masterson, Raoul Modena, Michele Roesler, Stefan Baltasar Dos Santos Pedrosa, Fernando Steerenberg, Rende |
author_sort | Tock, Jean-Philippe |
collection | CERN |
description | After reminding the mandate and the scope of the Run3 Installation Coordinator, the Run3 team members and their respective assignments will be present-ed. The methodology applied for the Run3 coordination will be explained and the priorities implementation will be shown. Based on the work carried out so far and on the results of the first Run3-LS3 PLAN exercise, the main interventions and challenges of the Run3 programmed stops, especially those linked to the anticipation of LS3 activities, will be underlined. Finally, the milestones will be integrated in the CERN accelerator complex long-term schedule following the methodology used to organise the Run2 programmed stops of the LHC and its injectors. |
id | cern-2842631 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2022 |
record_format | invenio |
spelling | cern-28426312022-11-30T19:36:14Zhttp://cds.cern.ch/record/2842631engTock, Jean-PhilippeBedel, Cyrille PatrickBernardini, MarziaEtheridge, John RobertFessia, PaoloLambert, AnnaLoertscher, YvesMasterson, RaoulModena, MicheleRoesler, StefanBaltasar Dos Santos Pedrosa, FernandoSteerenberg, RendeRun3 Installation CoordinationEngineeringAccelerators and Storage RingsAfter reminding the mandate and the scope of the Run3 Installation Coordinator, the Run3 team members and their respective assignments will be present-ed. The methodology applied for the Run3 coordination will be explained and the priorities implementation will be shown. Based on the work carried out so far and on the results of the first Run3-LS3 PLAN exercise, the main interventions and challenges of the Run3 programmed stops, especially those linked to the anticipation of LS3 activities, will be underlined. Finally, the milestones will be integrated in the CERN accelerator complex long-term schedule following the methodology used to organise the Run2 programmed stops of the LHC and its injectors. CERN-ACC-NOTE-2022-0037oai:cds.cern.ch:28426312022-10-11 |
spellingShingle | Engineering Accelerators and Storage Rings Tock, Jean-Philippe Bedel, Cyrille Patrick Bernardini, Marzia Etheridge, John Robert Fessia, Paolo Lambert, Anna Loertscher, Yves Masterson, Raoul Modena, Michele Roesler, Stefan Baltasar Dos Santos Pedrosa, Fernando Steerenberg, Rende Run3 Installation Coordination |
title | Run3 Installation Coordination |
title_full | Run3 Installation Coordination |
title_fullStr | Run3 Installation Coordination |
title_full_unstemmed | Run3 Installation Coordination |
title_short | Run3 Installation Coordination |
title_sort | run3 installation coordination |
topic | Engineering Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2842631 |
work_keys_str_mv | AT tockjeanphilippe run3installationcoordination AT bedelcyrillepatrick run3installationcoordination AT bernardinimarzia run3installationcoordination AT etheridgejohnrobert run3installationcoordination AT fessiapaolo run3installationcoordination AT lambertanna run3installationcoordination AT loertscheryves run3installationcoordination AT mastersonraoul run3installationcoordination AT modenamichele run3installationcoordination AT roeslerstefan run3installationcoordination AT baltasardossantospedrosafernando run3installationcoordination AT steerenbergrende run3installationcoordination |