Run3 Installation Coordination
After reminding the mandate and the scope of the Run3 Installation Coordinator, the Run3 team members and their respective assignments will be present-ed. The methodology applied for the Run3 coordination will be explained and the priorities implementation will be shown. Based on the work carried ou...
Autores principales: | Tock, Jean-Philippe, Bedel, Cyrille Patrick, Bernardini, Marzia, Etheridge, John Robert, Fessia, Paolo, Lambert, Anna, Loertscher, Yves, Masterson, Raoul, Modena, Michele, Roesler, Stefan, Baltasar Dos Santos Pedrosa, Fernando, Steerenberg, Rende |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2842631 |
Ejemplares similares
-
PLAN Tool
por: Baltasar Dos Santos Pedrosa, Fernando, et al.
Publicado: (2022) -
Summary Session 2: Injector Status and Beams for LHC, Dry Runs, Sector Tests with Beam
por: STEERENBERG, Rende
Publicado: (2014) -
Operational challenges and performance of the LHC during Run II
por: Steerenberg, Rende, et al.
Publicado: (2018) -
The Second Long Shutdown of the LHC and Its Injectors: Feedback from the Accelerator Coordination and Engineering Group
por: Perrot, Anne-Laure, et al.
Publicado: (2022) -
Programmed Stops Coordination: from Preparation to Completion
por: Vergara Fernandez, Estrella, et al.
Publicado: (2022)