PLAN Tool
To complete its mission, the Run3 Installation Coordination team needs a tool to centralize and collect, at a macroscopic scale, all activities to be performed in the programmed stops for Run3 and LS3, including those postponed from LS2. The LS2 experience and the similarity of needs made the PLAN t...
Autores principales: | Baltasar Dos Santos Pedrosa, Fernando, Masterson, Raoul, Tock, Jean-Philippe, Daudin, Benoit, Klem, Doreen, Lanza, Richard |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2842635 |
Ejemplares similares
-
Run3 Installation Coordination
por: Tock, Jean-Philippe, et al.
Publicado: (2022) -
Intervention Management from Operation to Shutdown
por: Garino, Cedric, et al.
Publicado: (2013) -
Reliability and Intervention Management for the LHC
por: Foraz, K, et al.
Publicado: (2012) -
Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex
por: Vergara Fernandez, Estrella, et al.
Publicado: (2022) -
A Quality Service for the CERN Accelerators and Technology Sector
por: Petit, Stephan, et al.
Publicado: (2022)