Cargando…
TCC2 Bridge Crane Refurbishment
The TCC2 area is a strategic facility which provides beam particles to the experiments located in the North-Area premises. The bridge crane serving this area is used to carry out all the handling operations of very sensitive accelerator components in an environment where the radiation dose rate is c...
Autor principal: | Rinaldesi, Roberto |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2843076 |
Ejemplares similares
-
Refurbishment of ROCLA
por: Latomaa, Aki Ilmari
Publicado: (2022) -
Refurbishing of the CERN PS Complex Personnel Protection System
por: Ninin, P, et al.
Publicado: (2014) -
Qualification of the radiation environment in the TCC2 experimental test area.
por: Fynbo, C A
Publicado: (2000) -
Monte Carlo Simulations of the TCC2 radiation test facility at CERN
por: Tsoulou, A, et al.
Publicado: (2003) -
Cleanroom refurbishment in SM18 within the SPL project frame, feasibility study
por: Chambrillon, J
Publicado: (2011)