Cargando…
Hostlab Projects for CV
Major upgrades to the Cooling and Ventilation (CV) infrastructure of ATLAS (Point 1) and CMS (Point 5) are required and constitute a vital part of the HostLab Phase 2 upgrade. This paper describes the main requirements, modifications and upgrades to the CV infrastructure as well as the challenges an...
Autores principales: | Dragoni, Francesco, Aivaliotis, Theodoros, Bozzi, Roberto Ales, Hanf, Pierre, Petrika, Gabor, Ruehl, Ingo |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2843080 |
Ejemplares similares
-
CERN EN-CV Consolidation Efforts
por: Petrika, Gabor
Publicado: (2022) -
R744 Primary Ultra-Low temperature Project for ATLAS & CMS Detectors Phase-2 Cooling Upgrade
por: Hanf, Pierre, et al.
Publicado: (2022) -
EN-CV Controls Project and Consolidation Challenges
por: Nitu, Doru-Octavian
Publicado: (2022) -
BIM Technology applied to CV Engineering
por: Morales Valenzuela, Rodrigo Alfonso
Publicado: (2022) -
CV activities on the LHC complex during the long shutdown
por: Deleval, S, et al.
Publicado: (2011)