Cargando…
Upgrade of LHC Point 5 Electrical Infrastructure
The electrical network in LHC Point 5 (P5) under-went a major renovation during the transition from LEP to LHC. The foreseen upgrades of LHC and CMS, in the frame-work of the HL-LHC and HostLab 2 projects, require once again major modifications and consolidation works, driven by a threefold growth i...
Autores principales: | Dos Santos, Nuno, Bertolasi, Stefano, Valdes, Pablo |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2843164 |
Ejemplares similares
-
Chapter 17: Technical infrastructure
por: Tavian, L, et al.
Publicado: (2020) -
Scenarios for the LHC Upgrade
por: Scandale, Walter, et al.
Publicado: (2008) -
LHC Upgrade Scenarios
por: Zimmermann, F
Publicado: (2007) -
Upgrade of the booster for LHC
por: Pedersen, J, et al.
Publicado: (1999) -
CERN LHC Technical Infrastructure Monitoring (TIM)
por: Epting, U, et al.
Publicado: (2000)