Cargando…
LHCb - Commissioning of the LHCb’s first level trigger
The LHCb’s Upgrade 1 aims to record 25 $fb^{-1}$ in Run3-4 with an increased luminosity of $2 \times 10^{33} cm^{-2} s^{-1}$, a factor 5 compared to Run1-2. The upgrade features a completely new DAQ system with a full software trigger. The reconstruction of events is performed at 30 MHz LHC non-empt...
Autor principal: | Scarabotto, Alessandro |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Acceso en línea: | http://cds.cern.ch/record/2843521 |
Ejemplares similares
-
Commissioning LHCb’s GPU high level trigger
por: Agapopoulou, Christina
Publicado: (2022) -
Commissioning LHCb’s GPU high level trigger
por: Agapopoulou, Christina
Publicado: (2021) -
Tracking on GPU at LHCb’s fully software trigger
por: Scarabotto, Alessandro
Publicado: (2022) -
Configuring LHCb’s High Level Trigger
por: Nolte, Niklas Stefan
Publicado: (2019) -
A Selection Framework for LHCb’s Upgrade Trigger
por: Nolte, Niklas
Publicado: (2021)