Cargando…
List of work to be carried out during September shut-down
Autor principal: | Brianti, G |
---|---|
Lenguaje: | eng |
Publicado: |
1960
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2844238 |
Ejemplares similares
-
Note on fast bumper maintenance work carried out during the long shut down January/February 1978
por: Grier, D
Publicado: (1978) -
List of work to be done during the September - October shut-down of the PS: 27th August - 23rd October 1962
por: Gouiran, R
Publicado: (1962) -
Report on the maintenance work carried out on the fast bumper system during the PS shut down 18-25th July, 1977
por: Grier, D
Publicado: (1977) -
Works to be done during the May shut-down
por: Gouiran, R
Publicado: (1962) -
Report on the maintenance work carried out on the fast bumper system during the shut down May 9th-June 9th, 1977
por: Grier, D
Publicado: (1977)