SPS Beam Dump System (SBDS) Commissioning After Relocation and Upgrade
In order to overcome several machine limitations, the SBDS has been relocated from LSS1 (Long Straight Section 1) to LSS5 during LS2 (Long Shutdown 2) with an important upgrade of the extraction kicker installation. An additional vertical deflection kicker magnet (MKDV) was produced and installed wh...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2022-THPOST039 http://cds.cern.ch/record/2845740 |
_version_ | 1780976566665216000 |
---|---|
author | Van Trappen, Pieter Carlier, Etienne Ducimetière, Laurent Namora, Vasco Senaj, Viliam Velotti, Francesco Voumard, Nicolas |
author_facet | Van Trappen, Pieter Carlier, Etienne Ducimetière, Laurent Namora, Vasco Senaj, Viliam Velotti, Francesco Voumard, Nicolas |
author_sort | Van Trappen, Pieter |
collection | CERN |
description | In order to overcome several machine limitations, the SBDS has been relocated from LSS1 (Long Straight Section 1) to LSS5 during LS2 (Long Shutdown 2) with an important upgrade of the extraction kicker installation. An additional vertical deflection kicker magnet (MKDV) was produced and installed while the high voltage (HV) pulse generators have been upgraded by changing gas-discharge switches (thyratrons and ignitrons) to semiconductor stacks operating in oil. Furthermore the horizontal sweep generators have been upgraded to allow for a lower kick strengths. The controls, previously consolidated during LS1, went through an additional light consolidation phase with among others the upgrade of the trigger & retrigger distribution system and the installation of a new fast-interlocks detection system. This paper describes the commissioning without and with beam and elaborates on the measured improvements and encountered problems with corrective mitigations. |
id | cern-2845740 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2022 |
record_format | invenio |
spelling | cern-28457402023-01-11T21:31:15Zdoi:10.18429/JACoW-IPAC2022-THPOST039http://cds.cern.ch/record/2845740engVan Trappen, PieterCarlier, EtienneDucimetière, LaurentNamora, VascoSenaj, ViliamVelotti, FrancescoVoumard, NicolasSPS Beam Dump System (SBDS) Commissioning After Relocation and UpgradeAccelerators and Storage RingsIn order to overcome several machine limitations, the SBDS has been relocated from LSS1 (Long Straight Section 1) to LSS5 during LS2 (Long Shutdown 2) with an important upgrade of the extraction kicker installation. An additional vertical deflection kicker magnet (MKDV) was produced and installed while the high voltage (HV) pulse generators have been upgraded by changing gas-discharge switches (thyratrons and ignitrons) to semiconductor stacks operating in oil. Furthermore the horizontal sweep generators have been upgraded to allow for a lower kick strengths. The controls, previously consolidated during LS1, went through an additional light consolidation phase with among others the upgrade of the trigger & retrigger distribution system and the installation of a new fast-interlocks detection system. This paper describes the commissioning without and with beam and elaborates on the measured improvements and encountered problems with corrective mitigations.oai:cds.cern.ch:28457402022 |
spellingShingle | Accelerators and Storage Rings Van Trappen, Pieter Carlier, Etienne Ducimetière, Laurent Namora, Vasco Senaj, Viliam Velotti, Francesco Voumard, Nicolas SPS Beam Dump System (SBDS) Commissioning After Relocation and Upgrade |
title | SPS Beam Dump System (SBDS) Commissioning After Relocation and Upgrade |
title_full | SPS Beam Dump System (SBDS) Commissioning After Relocation and Upgrade |
title_fullStr | SPS Beam Dump System (SBDS) Commissioning After Relocation and Upgrade |
title_full_unstemmed | SPS Beam Dump System (SBDS) Commissioning After Relocation and Upgrade |
title_short | SPS Beam Dump System (SBDS) Commissioning After Relocation and Upgrade |
title_sort | sps beam dump system (sbds) commissioning after relocation and upgrade |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2022-THPOST039 http://cds.cern.ch/record/2845740 |
work_keys_str_mv | AT vantrappenpieter spsbeamdumpsystemsbdscommissioningafterrelocationandupgrade AT carlieretienne spsbeamdumpsystemsbdscommissioningafterrelocationandupgrade AT ducimetierelaurent spsbeamdumpsystemsbdscommissioningafterrelocationandupgrade AT namoravasco spsbeamdumpsystemsbdscommissioningafterrelocationandupgrade AT senajviliam spsbeamdumpsystemsbdscommissioningafterrelocationandupgrade AT velottifrancesco spsbeamdumpsystemsbdscommissioningafterrelocationandupgrade AT voumardnicolas spsbeamdumpsystemsbdscommissioningafterrelocationandupgrade |