SPS Beam Dump System (SBDS) Commissioning After Relocation and Upgrade
In order to overcome several machine limitations, the SBDS has been relocated from LSS1 (Long Straight Section 1) to LSS5 during LS2 (Long Shutdown 2) with an important upgrade of the extraction kicker installation. An additional vertical deflection kicker magnet (MKDV) was produced and installed wh...
Autores principales: | Van Trappen, Pieter, Carlier, Etienne, Ducimetière, Laurent, Namora, Vasco, Senaj, Viliam, Velotti, Francesco, Voumard, Nicolas |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2022-THPOST039 http://cds.cern.ch/record/2845740 |
Ejemplares similares
-
Options to upgrade the triggering system of the SPS beam dumping system at CERN
por: Rodziewicz, J, et al.
Publicado: (2018) -
Beam Simulation Studies for the Upgrade of the SPS Beam Dumping System
por: Heßler, Christoph, et al.
Publicado: (2018) -
Considerations on an Upgrade Possibility of the LHC Beam Dump Kicker System
por: Fraser, Matthew, et al.
Publicado: (2016) -
Changes to the LHC Beam Dumping System for LHC Run 2
por: Uythoven, Jan, et al.
Publicado: (2015) -
Feasibility Study of a New SPS Beam Dump System
por: Velotti, Francesco, et al.
Publicado: (2015)