The HL-LHC Project Gets Ready for Its Deployment

Following the successful completion of the second long shutdown (LS2), the Large Hadron Collider (LHC) is preparing for its final operational run before the majority of the High Luminosity Upgrade (HL-LHC) will be installed during the third Long Shutdown starting in 2026. The HL-LHC upgrade will ena...

Descripción completa

Detalles Bibliográficos
Autores principales: Zerlauth, Markus, Brüning, Oliver, Di Girolamo, Beniamino, Fessia, Paolo, Gaignant, Christelle, Garcia Gavela, Hector, Maclean, Ewen, Modena, Michele, Otto, Thomas, Tavian, Laurent, Vandoni, Giovanna
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2022-MOPOST005
http://cds.cern.ch/record/2845741
_version_ 1780976566879125504
author Zerlauth, Markus
Brüning, Oliver
Di Girolamo, Beniamino
Fessia, Paolo
Gaignant, Christelle
Garcia Gavela, Hector
Maclean, Ewen
Modena, Michele
Otto, Thomas
Tavian, Laurent
Vandoni, Giovanna
author_facet Zerlauth, Markus
Brüning, Oliver
Di Girolamo, Beniamino
Fessia, Paolo
Gaignant, Christelle
Garcia Gavela, Hector
Maclean, Ewen
Modena, Michele
Otto, Thomas
Tavian, Laurent
Vandoni, Giovanna
author_sort Zerlauth, Markus
collection CERN
description Following the successful completion of the second long shutdown (LS2), the Large Hadron Collider (LHC) is preparing for its final operational run before the majority of the High Luminosity Upgrade (HL-LHC) will be installed during the third Long Shutdown starting in 2026. The HL-LHC upgrade will enable a further tenfold increase in integrated luminosity delivered to the ATLAS and CMS experiments, starting by an upgrade of the machine protection, collimation and shielding systems in LS2, and followed by the deployment of novel key technologies, including Nb₃Sn based insertion region magnets, cold powering by MgB₂ superconducting links and integration of Nb crab-cavities to compensate the effects of a larger crossing angle. After a period of intensive R&D and prototyping, the project is now entering the phase of industrialization and series production for all main components. In this contribution, we provide an overview of the project status and plans for deployment and performance ramp-up. Progress on the validation of key technologies, status of prototypes and series production as well as the final integration studies for the HL equipment are summarized. These are accompanied by the imminent completion of major civil engineering work and the start of infrastructure installations. Initial operational experience will be gained at the Inner Triplet (IT) String, presently in assembly at CERN’s Superconducting Magnet Test Facility, which will enable a fully integrated test of the main magnets, powering, and protection systems in the actual HL-LHC insertion configuration.
id cern-2845741
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28457412023-06-07T13:41:59Zdoi:10.18429/JACoW-IPAC2022-MOPOST005http://cds.cern.ch/record/2845741engZerlauth, MarkusBrüning, OliverDi Girolamo, BeniaminoFessia, PaoloGaignant, ChristelleGarcia Gavela, HectorMaclean, EwenModena, MicheleOtto, ThomasTavian, LaurentVandoni, GiovannaThe HL-LHC Project Gets Ready for Its DeploymentAccelerators and Storage RingsFollowing the successful completion of the second long shutdown (LS2), the Large Hadron Collider (LHC) is preparing for its final operational run before the majority of the High Luminosity Upgrade (HL-LHC) will be installed during the third Long Shutdown starting in 2026. The HL-LHC upgrade will enable a further tenfold increase in integrated luminosity delivered to the ATLAS and CMS experiments, starting by an upgrade of the machine protection, collimation and shielding systems in LS2, and followed by the deployment of novel key technologies, including Nb₃Sn based insertion region magnets, cold powering by MgB₂ superconducting links and integration of Nb crab-cavities to compensate the effects of a larger crossing angle. After a period of intensive R&D and prototyping, the project is now entering the phase of industrialization and series production for all main components. In this contribution, we provide an overview of the project status and plans for deployment and performance ramp-up. Progress on the validation of key technologies, status of prototypes and series production as well as the final integration studies for the HL equipment are summarized. These are accompanied by the imminent completion of major civil engineering work and the start of infrastructure installations. Initial operational experience will be gained at the Inner Triplet (IT) String, presently in assembly at CERN’s Superconducting Magnet Test Facility, which will enable a fully integrated test of the main magnets, powering, and protection systems in the actual HL-LHC insertion configuration.oai:cds.cern.ch:28457412022
spellingShingle Accelerators and Storage Rings
Zerlauth, Markus
Brüning, Oliver
Di Girolamo, Beniamino
Fessia, Paolo
Gaignant, Christelle
Garcia Gavela, Hector
Maclean, Ewen
Modena, Michele
Otto, Thomas
Tavian, Laurent
Vandoni, Giovanna
The HL-LHC Project Gets Ready for Its Deployment
title The HL-LHC Project Gets Ready for Its Deployment
title_full The HL-LHC Project Gets Ready for Its Deployment
title_fullStr The HL-LHC Project Gets Ready for Its Deployment
title_full_unstemmed The HL-LHC Project Gets Ready for Its Deployment
title_short The HL-LHC Project Gets Ready for Its Deployment
title_sort hl-lhc project gets ready for its deployment
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2022-MOPOST005
http://cds.cern.ch/record/2845741
work_keys_str_mv AT zerlauthmarkus thehllhcprojectgetsreadyforitsdeployment
AT bruningoliver thehllhcprojectgetsreadyforitsdeployment
AT digirolamobeniamino thehllhcprojectgetsreadyforitsdeployment
AT fessiapaolo thehllhcprojectgetsreadyforitsdeployment
AT gaignantchristelle thehllhcprojectgetsreadyforitsdeployment
AT garciagavelahector thehllhcprojectgetsreadyforitsdeployment
AT macleanewen thehllhcprojectgetsreadyforitsdeployment
AT modenamichele thehllhcprojectgetsreadyforitsdeployment
AT ottothomas thehllhcprojectgetsreadyforitsdeployment
AT tavianlaurent thehllhcprojectgetsreadyforitsdeployment
AT vandonigiovanna thehllhcprojectgetsreadyforitsdeployment
AT zerlauthmarkus hllhcprojectgetsreadyforitsdeployment
AT bruningoliver hllhcprojectgetsreadyforitsdeployment
AT digirolamobeniamino hllhcprojectgetsreadyforitsdeployment
AT fessiapaolo hllhcprojectgetsreadyforitsdeployment
AT gaignantchristelle hllhcprojectgetsreadyforitsdeployment
AT garciagavelahector hllhcprojectgetsreadyforitsdeployment
AT macleanewen hllhcprojectgetsreadyforitsdeployment
AT modenamichele hllhcprojectgetsreadyforitsdeployment
AT ottothomas hllhcprojectgetsreadyforitsdeployment
AT tavianlaurent hllhcprojectgetsreadyforitsdeployment
AT vandonigiovanna hllhcprojectgetsreadyforitsdeployment