The HL-LHC Project Gets Ready for Its Deployment
Following the successful completion of the second long shutdown (LS2), the Large Hadron Collider (LHC) is preparing for its final operational run before the majority of the High Luminosity Upgrade (HL-LHC) will be installed during the third Long Shutdown starting in 2026. The HL-LHC upgrade will ena...
Autores principales: | Zerlauth, Markus, Brüning, Oliver, Di Girolamo, Beniamino, Fessia, Paolo, Gaignant, Christelle, Garcia Gavela, Hector, Maclean, Ewen, Modena, Michele, Otto, Thomas, Tavian, Laurent, Vandoni, Giovanna |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2022-MOPOST005 http://cds.cern.ch/record/2845741 |
Ejemplares similares
-
The HL-LHC Machine
por: Bejar, I, et al.
Publicado: (2015) -
HL-LHC Parameter and Layout Baseline
por: Fessia, P, et al.
Publicado: (2015) -
High-Luminosity Large Hadron Collider (HL-LHC): Technical Design Report V. 0.1
por: Apollinari G., et al.
Publicado: (2017) -
Introduction to the HL-LHC Project
por: Rossi , L, et al.
Publicado: (2015) -
How to implement all HL-LHC upgrades
por: Rossi, L, et al.
Publicado: (2014)