Cargando…
Summary of the Post-Long Shutdown 2 LHC Hardware Commissioning Campaign
In this contribution we provide a summary of the LHC hardware commissioning campaign following the second CERN Long Shutdown (LS2), initially targeting the nominal LHC energy of 7 TeV. A summary of the test procedures and tools used for testing the LHC superconducting circuits is given, together wit...
Ejemplares similares
-
Qualification of the Bypass Continuity of the Main Dipole Magnet Circuits of the LHC
por: Rowan, Scott, et al.
Publicado: (2015) -
Systems performance: Circuits
por: Antoine, A, et al.
Publicado: (2019) -
Overview of the Performance of Quench Heaters for High-Current LHC Superconducting Magnets
por: Charifoulline, Zinour, et al.
Publicado: (2017) -
Enhanced Diagnostic Systems for the Supervision of the Superconducting Circuits of the LHC
por: Denz, Reiner, et al.
Publicado: (2015) -
An Enhanced Quench Detection System for Main Quadrupole Magnets in the Large Hadron Collider
por: Spasic, Jelena, et al.
Publicado: (2018)