Commissioning the New LLRF System of the CERN PS Booster

The PS Booster (PSB) is the first synchrotron in the injection chain for protons. The beams produced for the LHC and various fixed target experiments cover a very large parameter space. Over the Long Shutdown 2 (LS2), the PSB was heavily upgraded as part of the LHC Injectors Upgrade (LIU) project. T...

Descripción completa

Detalles Bibliográficos
Autores principales: Albright, Simon, Angoletta, Maria Elena, Barrientos, Diego, Findlay, Alan, Jaussi, Michael, Molendijk, John
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2022-WEPOTK012
http://cds.cern.ch/record/2845801
_version_ 1780976580453990400
author Albright, Simon
Angoletta, Maria Elena
Barrientos, Diego
Findlay, Alan
Jaussi, Michael
Molendijk, John
author_facet Albright, Simon
Angoletta, Maria Elena
Barrientos, Diego
Findlay, Alan
Jaussi, Michael
Molendijk, John
author_sort Albright, Simon
collection CERN
description The PS Booster (PSB) is the first synchrotron in the injection chain for protons. The beams produced for the LHC and various fixed target experiments cover a very large parameter space. Over the Long Shutdown 2 (LS2), the PSB was heavily upgraded as part of the LHC Injectors Upgrade (LIU) project. The low-level RF systems now drive the new Finemet-loaded cavities, control RF synchronisation for the new injection mechanism, and cope with the increased injection and extraction energies. The Finemet cavities provide exceptional flexibility, allowing an arbitrary distribution of voltage at different revolution frequency harmonics, but at the cost of significant broadband impedance. The new injection mechanism allows bunch-to-bucket multi-turn injection, which significantly reduces the amount of beam loss at the start of the cycle. The longitudinal beam production schema for each beam-type was developed based on simulations during LS2, and then adapted during the setting-up phase to suit the final operational configuration. This paper discusses the commissioning of the new LLRF, and the consequences of the LIU upgrades on the production of various beams.
id cern-2845801
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28458012023-01-11T21:31:21Zdoi:10.18429/JACoW-IPAC2022-WEPOTK012http://cds.cern.ch/record/2845801engAlbright, SimonAngoletta, Maria ElenaBarrientos, DiegoFindlay, AlanJaussi, MichaelMolendijk, JohnCommissioning the New LLRF System of the CERN PS BoosterAccelerators and Storage RingsThe PS Booster (PSB) is the first synchrotron in the injection chain for protons. The beams produced for the LHC and various fixed target experiments cover a very large parameter space. Over the Long Shutdown 2 (LS2), the PSB was heavily upgraded as part of the LHC Injectors Upgrade (LIU) project. The low-level RF systems now drive the new Finemet-loaded cavities, control RF synchronisation for the new injection mechanism, and cope with the increased injection and extraction energies. The Finemet cavities provide exceptional flexibility, allowing an arbitrary distribution of voltage at different revolution frequency harmonics, but at the cost of significant broadband impedance. The new injection mechanism allows bunch-to-bucket multi-turn injection, which significantly reduces the amount of beam loss at the start of the cycle. The longitudinal beam production schema for each beam-type was developed based on simulations during LS2, and then adapted during the setting-up phase to suit the final operational configuration. This paper discusses the commissioning of the new LLRF, and the consequences of the LIU upgrades on the production of various beams.oai:cds.cern.ch:28458012022
spellingShingle Accelerators and Storage Rings
Albright, Simon
Angoletta, Maria Elena
Barrientos, Diego
Findlay, Alan
Jaussi, Michael
Molendijk, John
Commissioning the New LLRF System of the CERN PS Booster
title Commissioning the New LLRF System of the CERN PS Booster
title_full Commissioning the New LLRF System of the CERN PS Booster
title_fullStr Commissioning the New LLRF System of the CERN PS Booster
title_full_unstemmed Commissioning the New LLRF System of the CERN PS Booster
title_short Commissioning the New LLRF System of the CERN PS Booster
title_sort commissioning the new llrf system of the cern ps booster
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2022-WEPOTK012
http://cds.cern.ch/record/2845801
work_keys_str_mv AT albrightsimon commissioningthenewllrfsystemofthecernpsbooster
AT angolettamariaelena commissioningthenewllrfsystemofthecernpsbooster
AT barrientosdiego commissioningthenewllrfsystemofthecernpsbooster
AT findlayalan commissioningthenewllrfsystemofthecernpsbooster
AT jaussimichael commissioningthenewllrfsystemofthecernpsbooster
AT molendijkjohn commissioningthenewllrfsystemofthecernpsbooster