Cargando…
Recent Experience from the Large-Scale Deployment of Power Converters with Magnet Energy Recovery
A new powering solution was deployed at CERN for transfer lines in the injector complex as part of the LHC injectors upgrade. The new powering uses regenerative power converters to recycle the magnet energy between physics operations. This work gives an overview of the developed technology, the way...
Autores principales: | Papastergiou, Konstantinos, Le Godec, Gilles, Montabonnet, Valerie |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2022-THPOTK020 http://cds.cern.ch/record/2845803 |
Ejemplares similares
-
Power Converter Topologies with Energy Recovery and Grid Power Limitation For Inductive Load Applications
por: Rossini, Stefano, et al.
Publicado: (2015) -
Study of Power Converter Topologies with Energy Recovery and grid power flow control Part B: boost converter with energy storage
por: Rogelio, Garcia Retegui, et al.
Publicado: (2015) -
Study of Power Converter Topologies with Energy Recovery and grid power flow control Part C: a review of alternative structures
por: Papastergiou, Konstantinos, et al.
Publicado: (2017) -
Study of Power Converter Topologies with Energy Recovery and grid power flow control. Part A: 2-quadrant converter with energy storage.
por: Maestri, S, et al.
Publicado: (2015) -
Figures of merit for the evaluation of regenerative power converters
por: Maestri, Sebastian, et al.
Publicado: (2016)