Cargando…

Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor

In the framework of the LHC Injectors Upgrade project, the Beam Gas Ionisation (BGI) profile monitors installed in the Proton Synchrotron (PS) were fitted with a gas injection system capable of boosting the signal rate high enough to capture single turn acquisitions immediately after injection. This...

Descripción completa

Detalles Bibliográficos
Autores principales: Fraser, Matthew, Coly, Marcel, Guerrero, Ana, Huschauer, Alexander, Jensen, Steen, Levasseur, Swann, Roncarolo, Federico, Rossi, Adriana, Sandberg, Hampus, Storey, James
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2022-WEPOTK043
http://cds.cern.ch/record/2845867
_version_ 1780976595442335744
author Fraser, Matthew
Coly, Marcel
Guerrero, Ana
Huschauer, Alexander
Jensen, Steen
Levasseur, Swann
Roncarolo, Federico
Rossi, Adriana
Sandberg, Hampus
Storey, James
author_facet Fraser, Matthew
Coly, Marcel
Guerrero, Ana
Huschauer, Alexander
Jensen, Steen
Levasseur, Swann
Roncarolo, Federico
Rossi, Adriana
Sandberg, Hampus
Storey, James
author_sort Fraser, Matthew
collection CERN
description In the framework of the LHC Injectors Upgrade project, the Beam Gas Ionisation (BGI) profile monitors installed in the Proton Synchrotron (PS) were fitted with a gas injection system capable of boosting the signal rate high enough to capture single turn acquisitions immediately after injection. This contribution reports on the studies carried out during the beam commissioning of the BGI system in a turn-by-turn matching monitor mode for its eventual implementation in an optimisation framework to preserve emittance during transfer between the PS Booster and PS. The BGI commissioning included a benchmarking with data from a wire-grid secondary emission monitor inserted into the circulating beam.
id cern-2845867
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28458672023-01-11T21:31:27Zdoi:10.18429/JACoW-IPAC2022-WEPOTK043http://cds.cern.ch/record/2845867engFraser, MatthewColy, MarcelGuerrero, AnaHuschauer, AlexanderJensen, SteenLevasseur, SwannRoncarolo, FedericoRossi, AdrianaSandberg, HampusStorey, JamesMatching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation MonitorAccelerators and Storage RingsIn the framework of the LHC Injectors Upgrade project, the Beam Gas Ionisation (BGI) profile monitors installed in the Proton Synchrotron (PS) were fitted with a gas injection system capable of boosting the signal rate high enough to capture single turn acquisitions immediately after injection. This contribution reports on the studies carried out during the beam commissioning of the BGI system in a turn-by-turn matching monitor mode for its eventual implementation in an optimisation framework to preserve emittance during transfer between the PS Booster and PS. The BGI commissioning included a benchmarking with data from a wire-grid secondary emission monitor inserted into the circulating beam.oai:cds.cern.ch:28458672022
spellingShingle Accelerators and Storage Rings
Fraser, Matthew
Coly, Marcel
Guerrero, Ana
Huschauer, Alexander
Jensen, Steen
Levasseur, Swann
Roncarolo, Federico
Rossi, Adriana
Sandberg, Hampus
Storey, James
Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor
title Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor
title_full Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor
title_fullStr Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor
title_full_unstemmed Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor
title_short Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor
title_sort matching studies between the cern psb and ps using turn-by-turn beam profile acquisitions with a residual beam gas ionisation monitor
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2022-WEPOTK043
http://cds.cern.ch/record/2845867
work_keys_str_mv AT frasermatthew matchingstudiesbetweenthecernpsbandpsusingturnbyturnbeamprofileacquisitionswitharesidualbeamgasionisationmonitor
AT colymarcel matchingstudiesbetweenthecernpsbandpsusingturnbyturnbeamprofileacquisitionswitharesidualbeamgasionisationmonitor
AT guerreroana matchingstudiesbetweenthecernpsbandpsusingturnbyturnbeamprofileacquisitionswitharesidualbeamgasionisationmonitor
AT huschaueralexander matchingstudiesbetweenthecernpsbandpsusingturnbyturnbeamprofileacquisitionswitharesidualbeamgasionisationmonitor
AT jensensteen matchingstudiesbetweenthecernpsbandpsusingturnbyturnbeamprofileacquisitionswitharesidualbeamgasionisationmonitor
AT levasseurswann matchingstudiesbetweenthecernpsbandpsusingturnbyturnbeamprofileacquisitionswitharesidualbeamgasionisationmonitor
AT roncarolofederico matchingstudiesbetweenthecernpsbandpsusingturnbyturnbeamprofileacquisitionswitharesidualbeamgasionisationmonitor
AT rossiadriana matchingstudiesbetweenthecernpsbandpsusingturnbyturnbeamprofileacquisitionswitharesidualbeamgasionisationmonitor
AT sandberghampus matchingstudiesbetweenthecernpsbandpsusingturnbyturnbeamprofileacquisitionswitharesidualbeamgasionisationmonitor
AT storeyjames matchingstudiesbetweenthecernpsbandpsusingturnbyturnbeamprofileacquisitionswitharesidualbeamgasionisationmonitor