ELENA - From Commissioning to Operation
In 2021 the Extra Low ENergy Antiproton ring (ELENA) moved from commissioning into the physics production phase providing 100 keV antiprotons to the newly connected experiments paving the way to an improved trapping efficiency by one to two orders of magnitude compared to the AD era. After recalling...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2022-THOXGD1 http://cds.cern.ch/record/2845870 |
_version_ | 1780976596109230080 |
---|---|
author | Ponce, Laurette Bojtár, Lajos Carli, Christian Dupuy, Bruno Dutheil, Yann Freyermuth, Pierre Gamba, Davide Jørgensen, Lars Lefort, Bertrand Pasinelli, Sergio |
author_facet | Ponce, Laurette Bojtár, Lajos Carli, Christian Dupuy, Bruno Dutheil, Yann Freyermuth, Pierre Gamba, Davide Jørgensen, Lars Lefort, Bertrand Pasinelli, Sergio |
author_sort | Ponce, Laurette |
collection | CERN |
description | In 2021 the Extra Low ENergy Antiproton ring (ELENA) moved from commissioning into the physics production phase providing 100 keV antiprotons to the newly connected experiments paving the way to an improved trapping efficiency by one to two orders of magnitude compared to the AD era. After recalling the major work undertaken during the CERN Long Shutdown 2 (2019-2020) in the antiproton deceleration complex, details will be given on the ELENA ring and the new electrostatic transfer line beam commissioning using an ion source. Sub-sequentially, the progress from commissioning with ions to operation with antiprotons will be described with emphasis on the achieved beam performance. Finally, the impact on the performance of the main hardware systems will be reviewed. |
id | cern-2845870 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2022 |
record_format | invenio |
spelling | cern-28458702023-01-11T21:31:27Zdoi:10.18429/JACoW-IPAC2022-THOXGD1http://cds.cern.ch/record/2845870engPonce, LauretteBojtár, LajosCarli, ChristianDupuy, BrunoDutheil, YannFreyermuth, PierreGamba, DavideJørgensen, LarsLefort, BertrandPasinelli, SergioELENA - From Commissioning to OperationAccelerators and Storage RingsIn 2021 the Extra Low ENergy Antiproton ring (ELENA) moved from commissioning into the physics production phase providing 100 keV antiprotons to the newly connected experiments paving the way to an improved trapping efficiency by one to two orders of magnitude compared to the AD era. After recalling the major work undertaken during the CERN Long Shutdown 2 (2019-2020) in the antiproton deceleration complex, details will be given on the ELENA ring and the new electrostatic transfer line beam commissioning using an ion source. Sub-sequentially, the progress from commissioning with ions to operation with antiprotons will be described with emphasis on the achieved beam performance. Finally, the impact on the performance of the main hardware systems will be reviewed.oai:cds.cern.ch:28458702022 |
spellingShingle | Accelerators and Storage Rings Ponce, Laurette Bojtár, Lajos Carli, Christian Dupuy, Bruno Dutheil, Yann Freyermuth, Pierre Gamba, Davide Jørgensen, Lars Lefort, Bertrand Pasinelli, Sergio ELENA - From Commissioning to Operation |
title | ELENA - From Commissioning to Operation |
title_full | ELENA - From Commissioning to Operation |
title_fullStr | ELENA - From Commissioning to Operation |
title_full_unstemmed | ELENA - From Commissioning to Operation |
title_short | ELENA - From Commissioning to Operation |
title_sort | elena - from commissioning to operation |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2022-THOXGD1 http://cds.cern.ch/record/2845870 |
work_keys_str_mv | AT poncelaurette elenafromcommissioningtooperation AT bojtarlajos elenafromcommissioningtooperation AT carlichristian elenafromcommissioningtooperation AT dupuybruno elenafromcommissioningtooperation AT dutheilyann elenafromcommissioningtooperation AT freyermuthpierre elenafromcommissioningtooperation AT gambadavide elenafromcommissioningtooperation AT jørgensenlars elenafromcommissioningtooperation AT lefortbertrand elenafromcommissioningtooperation AT pasinellisergio elenafromcommissioningtooperation |