Cargando…
ELENA - From Commissioning to Operation
In 2021 the Extra Low ENergy Antiproton ring (ELENA) moved from commissioning into the physics production phase providing 100 keV antiprotons to the newly connected experiments paving the way to an improved trapping efficiency by one to two orders of magnitude compared to the AD era. After recalling...
Autores principales: | Ponce, Laurette, Bojtár, Lajos, Carli, Christian, Dupuy, Bruno, Dutheil, Yann, Freyermuth, Pierre, Gamba, Davide, Jørgensen, Lars, Lefort, Bertrand, Pasinelli, Sergio |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2022-THOXGD1 http://cds.cern.ch/record/2845870 |
Ejemplares similares
-
ELENA Commissioning
por: Gamba, Davide, et al.
Publicado: (2020) -
ELENA Commissioning and Status
por: Carli, Christian, et al.
Publicado: (2021) -
ELENA - From Installation to Commissioning
por: Eriksson, Tommy, et al.
Publicado: (2017) -
AD/ELENA Electron Cooling Experience During and after CERNs Long Shutdown (LS2)
por: Gamba, Davide, et al.
Publicado: (2021) -
Commissioning of the ELENA Electrostatic Transfer Lines for the Antimatter Facility at CERN
por: Dutheil, Yann, et al.
Publicado: (2022)