Cargando…
Installation of new crystal collimators in the LHC tunnel at Point 7
A new generation of crystal collimators are installed in the LHC tunnel to provide improved capabilities for ion beam operation for the future High Luminosity (HL-LHC) project. These units complement those already installed in the LHC at Point 7, the interaction point responsible for safely eliminat...
Autor principal: | Brice, Maximilien |
---|---|
Publicado: |
2023
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2848429 |
Ejemplares similares
-
Target Collimator Long Dispersion suppressor (TCLD) installation near ALICE in the tunnel
por: Brice, Maximilien
Publicado: (2020) -
Installation of the Beam Gas Curtain in the LHC tunnel
por: Brice, Maximilien
Publicado: (2023) -
First phase of installation of FASER in the LHC tunnel
por: Brice, Maximilien
Publicado: (2020) -
Collimator P1 Installation 2018
por: Brice, Maximilien, et al.
Publicado: (2018) -
FASER installation in TI12 tunnel
por: Maximilien, Brice, et al.
Publicado: (2021)