Cargando…
Long shutdown 2 LHC smoothing status and data analysis
During the two-year Long Shut-Down 2 (LS2), triggered by the LHC Injectors Upgrade (LIU) project, the CERN surveyors took in charge the smoothing of the 27km com- ponents of the LHC to guarantee its best beam aperture and energy performance for the RUN3 between 2022 and 2026. During this large m...
Autores principales: | Fuchs, Jean-Frederic, Widuch, Kacper |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2849060 |
Ejemplares similares
-
The management of large cabling campaigns during the Long Shutdown 1 of LHC
por: Meroli, Stefano, et al.
Publicado: (2014) -
Long Shutdown 2 @ LHC
por: Bernardini, M, et al.
Publicado: (2015) -
Work for the LHC’s first long shutdown
Publicado: (2013) -
ALICE upgrades during the LHC Long Shutdown 2
por: The ALICE collaboration
Publicado: (2023) -
The Second LHC Long Shutdown (LS2) for the Superconducting Magnets
por: Tock, Jean-Philippe, et al.
Publicado: (2018)