Cargando…

Celebration for the delivery of the last High Order (HO) corrector magnet by INFN to the HL-LHC project

A celebration for the delivery of the last HO corrector magnet was held at LASA (Milan, Italy). The HO correctors for the HL-LHC project were designed at INFN LASA and have been manufactured in the industry. The 54 superferric multipoles were first delivered to INFN LASA, where they were tested befo...

Descripción completa

Detalles Bibliográficos
Autor principal: Musso, Andrea
Publicado: 2023
Materias:
Acceso en línea:http://cds.cern.ch/record/2850451
Descripción
Sumario:A celebration for the delivery of the last HO corrector magnet was held at LASA (Milan, Italy). The HO correctors for the HL-LHC project were designed at INFN LASA and have been manufactured in the industry. The 54 superferric multipoles were first delivered to INFN LASA, where they were tested before final delivery to CERN. The HO correctors will be the first magnets based on superferric technology to be installed in the LHC.