Cargando…
HL-LHC BPM System Development Status
The demanding instrumentation requirements of the future High Luminosity LHC (HL-LHC) require 44 newly designed Beam Position Monitors (BPM) to be installed around the ATLAS and CMS experiments in 2026-2028. Three BPM types are now in pre-series production, with two more variants under design. Close...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2022-WEP12 http://cds.cern.ch/record/2852567 |
_version_ | 1780977153357119488 |
---|---|
author | Krupa, Michal Bett, Douglas Degl'Innocenti, Irene Gudkov, Dmitry Schneider, Gerhard |
author_facet | Krupa, Michal Bett, Douglas Degl'Innocenti, Irene Gudkov, Dmitry Schneider, Gerhard |
author_sort | Krupa, Michal |
collection | CERN |
description | The demanding instrumentation requirements of the future High Luminosity LHC (HL-LHC) require 44 newly designed Beam Position Monitors (BPM) to be installed around the ATLAS and CMS experiments in 2026-2028. Three BPM types are now in pre-series production, with two more variants under design. Close to the collision point, a set of cryogenic directive coupler BPMs equipped with a brand new acquisition system based on nearly-direct digitization will resolve the position of the two counter-rotating LHC beams occupying a common vacuum chamber. Other new button and stripline BPMs will provide not only the transverse beam position, but also timing signals for the experiments, and diagnostics for the new HL-LHC crab cavities. This contribution summarizes the HL-LHC BPM specifications, gives an overview of the new BPM designs, reports on the pre-series BPM production status and plans for series manufacturing, outlines the foreseen acquisition system architecture, and highlights the first beam measurements carried out with the proof-of-concept electronics for the directive stripline BPMs. |
id | cern-2852567 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2022 |
record_format | invenio |
spelling | cern-28525672023-06-07T12:03:52Zdoi:10.18429/JACoW-IBIC2022-WEP12http://cds.cern.ch/record/2852567engKrupa, MichalBett, DouglasDegl'Innocenti, IreneGudkov, DmitrySchneider, GerhardHL-LHC BPM System Development StatusAccelerators and Storage RingsThe demanding instrumentation requirements of the future High Luminosity LHC (HL-LHC) require 44 newly designed Beam Position Monitors (BPM) to be installed around the ATLAS and CMS experiments in 2026-2028. Three BPM types are now in pre-series production, with two more variants under design. Close to the collision point, a set of cryogenic directive coupler BPMs equipped with a brand new acquisition system based on nearly-direct digitization will resolve the position of the two counter-rotating LHC beams occupying a common vacuum chamber. Other new button and stripline BPMs will provide not only the transverse beam position, but also timing signals for the experiments, and diagnostics for the new HL-LHC crab cavities. This contribution summarizes the HL-LHC BPM specifications, gives an overview of the new BPM designs, reports on the pre-series BPM production status and plans for series manufacturing, outlines the foreseen acquisition system architecture, and highlights the first beam measurements carried out with the proof-of-concept electronics for the directive stripline BPMs.oai:cds.cern.ch:28525672022 |
spellingShingle | Accelerators and Storage Rings Krupa, Michal Bett, Douglas Degl'Innocenti, Irene Gudkov, Dmitry Schneider, Gerhard HL-LHC BPM System Development Status |
title | HL-LHC BPM System Development Status |
title_full | HL-LHC BPM System Development Status |
title_fullStr | HL-LHC BPM System Development Status |
title_full_unstemmed | HL-LHC BPM System Development Status |
title_short | HL-LHC BPM System Development Status |
title_sort | hl-lhc bpm system development status |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IBIC2022-WEP12 http://cds.cern.ch/record/2852567 |
work_keys_str_mv | AT krupamichal hllhcbpmsystemdevelopmentstatus AT bettdouglas hllhcbpmsystemdevelopmentstatus AT deglinnocentiirene hllhcbpmsystemdevelopmentstatus AT gudkovdmitry hllhcbpmsystemdevelopmentstatus AT schneidergerhard hllhcbpmsystemdevelopmentstatus |