Cargando…

HL-LHC BPM System Development Status

The demanding instrumentation requirements of the future High Luminosity LHC (HL-LHC) require 44 newly designed Beam Position Monitors (BPM) to be installed around the ATLAS and CMS experiments in 2026-2028. Three BPM types are now in pre-series production, with two more variants under design. Close...

Descripción completa

Detalles Bibliográficos
Autores principales: Krupa, Michal, Bett, Douglas, Degl'Innocenti, Irene, Gudkov, Dmitry, Schneider, Gerhard
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IBIC2022-WEP12
http://cds.cern.ch/record/2852567
_version_ 1780977153357119488
author Krupa, Michal
Bett, Douglas
Degl'Innocenti, Irene
Gudkov, Dmitry
Schneider, Gerhard
author_facet Krupa, Michal
Bett, Douglas
Degl'Innocenti, Irene
Gudkov, Dmitry
Schneider, Gerhard
author_sort Krupa, Michal
collection CERN
description The demanding instrumentation requirements of the future High Luminosity LHC (HL-LHC) require 44 newly designed Beam Position Monitors (BPM) to be installed around the ATLAS and CMS experiments in 2026-2028. Three BPM types are now in pre-series production, with two more variants under design. Close to the collision point, a set of cryogenic directive coupler BPMs equipped with a brand new acquisition system based on nearly-direct digitization will resolve the position of the two counter-rotating LHC beams occupying a common vacuum chamber. Other new button and stripline BPMs will provide not only the transverse beam position, but also timing signals for the experiments, and diagnostics for the new HL-LHC crab cavities. This contribution summarizes the HL-LHC BPM specifications, gives an overview of the new BPM designs, reports on the pre-series BPM production status and plans for series manufacturing, outlines the foreseen acquisition system architecture, and highlights the first beam measurements carried out with the proof-of-concept electronics for the directive stripline BPMs.
id cern-2852567
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28525672023-06-07T12:03:52Zdoi:10.18429/JACoW-IBIC2022-WEP12http://cds.cern.ch/record/2852567engKrupa, MichalBett, DouglasDegl'Innocenti, IreneGudkov, DmitrySchneider, GerhardHL-LHC BPM System Development StatusAccelerators and Storage RingsThe demanding instrumentation requirements of the future High Luminosity LHC (HL-LHC) require 44 newly designed Beam Position Monitors (BPM) to be installed around the ATLAS and CMS experiments in 2026-2028. Three BPM types are now in pre-series production, with two more variants under design. Close to the collision point, a set of cryogenic directive coupler BPMs equipped with a brand new acquisition system based on nearly-direct digitization will resolve the position of the two counter-rotating LHC beams occupying a common vacuum chamber. Other new button and stripline BPMs will provide not only the transverse beam position, but also timing signals for the experiments, and diagnostics for the new HL-LHC crab cavities. This contribution summarizes the HL-LHC BPM specifications, gives an overview of the new BPM designs, reports on the pre-series BPM production status and plans for series manufacturing, outlines the foreseen acquisition system architecture, and highlights the first beam measurements carried out with the proof-of-concept electronics for the directive stripline BPMs.oai:cds.cern.ch:28525672022
spellingShingle Accelerators and Storage Rings
Krupa, Michal
Bett, Douglas
Degl'Innocenti, Irene
Gudkov, Dmitry
Schneider, Gerhard
HL-LHC BPM System Development Status
title HL-LHC BPM System Development Status
title_full HL-LHC BPM System Development Status
title_fullStr HL-LHC BPM System Development Status
title_full_unstemmed HL-LHC BPM System Development Status
title_short HL-LHC BPM System Development Status
title_sort hl-lhc bpm system development status
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IBIC2022-WEP12
http://cds.cern.ch/record/2852567
work_keys_str_mv AT krupamichal hllhcbpmsystemdevelopmentstatus
AT bettdouglas hllhcbpmsystemdevelopmentstatus
AT deglinnocentiirene hllhcbpmsystemdevelopmentstatus
AT gudkovdmitry hllhcbpmsystemdevelopmentstatus
AT schneidergerhard hllhcbpmsystemdevelopmentstatus