Cargando…
Fast Spill Monitor Studies for the SPS Fixed Target Beams
At the CERN Super Proton Synchrotron (SPS) the proton beam is supplied to the fixed target experiments in the North Area facility (NA) via a slow extraction process, taking place at 400 GeV. The monitoring of the spill quality during the extraction, lasting 4.8 seconds with the present SPS setup, is...
Autores principales: | Roncarolo, Federico, Arrutia Sota, Pablo Andreas, Belohrad, David, Bergamaschi, Michele, Calvo Giraldo, Eva, Effinger, Ewald, Fraser, Matthew, Kain, Verena, Martin Nieto, Miguel, Mazzoni, Stefano, Ortega Ruiz, Inaki, Tan, Jocelyn, Velotti, Francesco, Zamantzas, Christos |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2022-WE3C3 http://cds.cern.ch/record/2852569 |
Ejemplares similares
-
New Spill Control for the Slow Extraction in the Multi-Cycling SPS
por: Kain, Verena, et al.
Publicado: (2016) -
Characterisation of SPS slow extraction spill quality degradation
por: Velotti, Francesco, et al.
Publicado: (2019) -
Implementation of RF Channeling at the CERN PS for Spill Quality Improvements
por: Arrutia Sota, Pablo Andreas, et al.
Publicado: (2022) -
A Probabilistic Model of SPS Slow Extraction: A Simplified Approach for Efficient Spill Quality Simulations
por: Mignacco, Chiara, et al.
Publicado: (2022) -
Observations of SPS Slow-Extracted Spill Quality Degradation and Possible Improvements
por: Velotti, Francesco, et al.
Publicado: (2018)