Cargando…
Results from e+ measurements at LIL in December 1989
Autores principales: | Braun, H, Madsen, J, Riche, A, Rinolfi, L |
---|---|
Lenguaje: | eng |
Publicado: |
1990
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2853825 |
Ejemplares similares
Cargando…
Réaménagement de la zone amont du convertisseur du LIL V
por: Rinolfi, L
Publicado: (1988)
por: Rinolfi, L
Publicado: (1988)
Ejemplares similares
-
Operation of LIL in 1989: A proposal
por: Bossart, R, et al.
Publicado: (1989) -
Proposal for an improvement of positron capture at LIL
por: Braun, H, et al.
Publicado: (1992) -
Status report and experimental results of the LIL
por: Rinolfi, L
Publicado: (1991) -
Second experiment with the e- beam kicked through a hole next to the converter target, first experience in operation.17 and 18 October 1989
por: Madsen, JHB, et al.
Publicado: (1989) -
The positron production at LIL
por: Rinolfi, Louis
Publicado: (1992)