Cargando…
Technical specification for the supply and installation of a 3 GHz distribution system in 1-5/8" coaxial line for the LEP preinjector linacs
Lenguaje: | eng |
---|---|
Publicado: |
1983
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2854213 |
Ejemplares similares
-
Specification for the supply and laying of piping for the LPI project (LEP preinjector) cooling installation
Publicado: (1983) -
On the siting of the LEP preinjector
por: Standley, P H
Publicado: (1981) -
Controls for the LEP preinjector
por: Kuiper, B
Publicado: (1985) -
Controls for the LEP preinjector
por: Kuiper, B
Publicado: (1985) -
Technical specification for the supply and installation of high-power S-band RF networks for the LEP pre-injector LINACS
Publicado: (1983)