Cargando…
One half of the Upstream Tracker (UT) being moved
Down in the cavern the overhead crane moves one half of the Upstream Tracker.
Autor principal: | Franco Sevilla, Manuel |
---|---|
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2855901 |
Ejemplares similares
-
One half of the Upstream Tracker (UT)
por: Franco Sevilla, Manuel
Publicado: (2022) -
Lowering one half of the Upstream Tracker (UT) down the 100 metre access shaft
por: Franco Sevilla, Manuel
Publicado: (2022) -
Measurement of the position of an Upstream Tracker (UT) module
por: Franco Sevilla, Manuel
Publicado: (2022) -
The LHCb Upstream Tracker (UT) and the beam pipe
por: Batista Lopes, Joao
Publicado: (2023) -
Inspection of the LHCb Upstream Tracker (UT) in clean room before installation
por: Brice, Maximilien
Publicado: (2022)