Cargando…

Progress and R/D challenges for FCC-ee SRF

The FCC-ee machines present a huge challenge for the RF systems, which need to be adapted to very diverse beam conditions going from moderate energy and high current for the Z machine to high energy and low beam current for the ttbar. This inverse scaling results naturally from a fixed budget for th...

Descripción completa

Detalles Bibliográficos
Autores principales: Venturini Delsolaro, W, Garlasche, M, Peauger, F, Rosaz, G, Karpov, I, Zhang, L, Valente Feliciano, A M, Udongwo, S A, Bianchi, A, Bellini, G, Ferrera, L M A, Pereira Carlos, C, Vega Cid, L, Leith, S, Proslier, T, Gorgi Zadeh, S, Timmins, M, Therasse, M, Koettig, T, Atieh, S, Brunner, O, Gerigk, F
Lenguaje:eng
Publicado: 2023
Materias:
Acceso en línea:https://dx.doi.org/10.1140/epjti/s40485-023-00094-5
http://cds.cern.ch/record/2856428

Ejemplares similares