Protection Scheme Effectiveness Study for the High-Luminosity LHC MBRD Magnet
The MBRD (Main Bending Recombination Dipole, or D2) is one of the magnets in the interaction region of the LHC that needs to be replaced in order to fulfill the requirements of the High-Luminosity upgrade. The magnetic field must be increased up to 4.5 T in an aperture with a diameter of 105 mm and...
Autores principales: | , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2023
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2023.3247984 http://cds.cern.ch/record/2857714 |
_version_ | 1780977578330292224 |
---|---|
author | Caiffi, Barbara Bender, Lennard Bersani, Andrea Farinon, Stefania Foussat, Arnaud Levi, Filippo Mangiarotti, Franco Musenich, Riccardo Novelli, Daniel Pampaloni, Alessandra Ravaioli, Emmanuele Todesco, Ezio Willering, Gerard |
author_facet | Caiffi, Barbara Bender, Lennard Bersani, Andrea Farinon, Stefania Foussat, Arnaud Levi, Filippo Mangiarotti, Franco Musenich, Riccardo Novelli, Daniel Pampaloni, Alessandra Ravaioli, Emmanuele Todesco, Ezio Willering, Gerard |
author_sort | Caiffi, Barbara |
collection | CERN |
description | The MBRD (Main Bending Recombination Dipole, or D2) is one of the magnets in the interaction region of the LHC that needs to be replaced in order to fulfill the requirements of the High-Luminosity upgrade. The magnetic field must be increased up to 4.5 T in an aperture with a diameter of 105 mm and a total length of about 8 m, to reach the target integrated field of 35 T$\cdot$m. The increase of the magnetic field and, consequently, of the cross talk between the two apertures having the same polarity required a brand-new design characterized by asymmetric left-right coils and aluminum rings around the two apertures in order to compensate the repulsive Lorentz forces arising between them. The design was carried out at INFN, while the construction is taking place at the ASG Superconductors (Genova, Italy). The development plan was to initially build a 1.6 m long model, completed and cold tested in summer 2020, a full scale prototype, whose cold tests are now ongoing, followed by a series of six magnets, presently under construction. The test campaign performed on the short model and the one currently underway on the prototype provide very useful information for the magnets of the series, such as the behavior of the protection circuit in case of quenches. During the measurements performed at CERN, several quenches induced by the quench heaters were provoked, and the magnet behavior was recorded for different initial currents. This contribution will focus on the results of such tests and their comparison with the predictions obtained through the simulations with two different codes, Roxie and STEAM-LEDET. |
id | cern-2857714 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2023 |
record_format | invenio |
spelling | cern-28577142023-05-05T15:20:48Zdoi:10.1109/TASC.2023.3247984http://cds.cern.ch/record/2857714engCaiffi, BarbaraBender, LennardBersani, AndreaFarinon, StefaniaFoussat, ArnaudLevi, FilippoMangiarotti, FrancoMusenich, RiccardoNovelli, DanielPampaloni, AlessandraRavaioli, EmmanueleTodesco, EzioWillering, GerardProtection Scheme Effectiveness Study for the High-Luminosity LHC MBRD MagnetAccelerators and Storage RingsThe MBRD (Main Bending Recombination Dipole, or D2) is one of the magnets in the interaction region of the LHC that needs to be replaced in order to fulfill the requirements of the High-Luminosity upgrade. The magnetic field must be increased up to 4.5 T in an aperture with a diameter of 105 mm and a total length of about 8 m, to reach the target integrated field of 35 T$\cdot$m. The increase of the magnetic field and, consequently, of the cross talk between the two apertures having the same polarity required a brand-new design characterized by asymmetric left-right coils and aluminum rings around the two apertures in order to compensate the repulsive Lorentz forces arising between them. The design was carried out at INFN, while the construction is taking place at the ASG Superconductors (Genova, Italy). The development plan was to initially build a 1.6 m long model, completed and cold tested in summer 2020, a full scale prototype, whose cold tests are now ongoing, followed by a series of six magnets, presently under construction. The test campaign performed on the short model and the one currently underway on the prototype provide very useful information for the magnets of the series, such as the behavior of the protection circuit in case of quenches. During the measurements performed at CERN, several quenches induced by the quench heaters were provoked, and the magnet behavior was recorded for different initial currents. This contribution will focus on the results of such tests and their comparison with the predictions obtained through the simulations with two different codes, Roxie and STEAM-LEDET.oai:cds.cern.ch:28577142023 |
spellingShingle | Accelerators and Storage Rings Caiffi, Barbara Bender, Lennard Bersani, Andrea Farinon, Stefania Foussat, Arnaud Levi, Filippo Mangiarotti, Franco Musenich, Riccardo Novelli, Daniel Pampaloni, Alessandra Ravaioli, Emmanuele Todesco, Ezio Willering, Gerard Protection Scheme Effectiveness Study for the High-Luminosity LHC MBRD Magnet |
title | Protection Scheme Effectiveness Study for the High-Luminosity LHC MBRD Magnet |
title_full | Protection Scheme Effectiveness Study for the High-Luminosity LHC MBRD Magnet |
title_fullStr | Protection Scheme Effectiveness Study for the High-Luminosity LHC MBRD Magnet |
title_full_unstemmed | Protection Scheme Effectiveness Study for the High-Luminosity LHC MBRD Magnet |
title_short | Protection Scheme Effectiveness Study for the High-Luminosity LHC MBRD Magnet |
title_sort | protection scheme effectiveness study for the high-luminosity lhc mbrd magnet |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/TASC.2023.3247984 http://cds.cern.ch/record/2857714 |
work_keys_str_mv | AT caiffibarbara protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT benderlennard protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT bersaniandrea protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT farinonstefania protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT foussatarnaud protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT levifilippo protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT mangiarottifranco protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT musenichriccardo protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT novellidaniel protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT pampalonialessandra protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT ravaioliemmanuele protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT todescoezio protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet AT willeringgerard protectionschemeeffectivenessstudyforthehighluminositylhcmbrdmagnet |