Fabrication and Power Test of Last MCBXFB Magnets
MCBXFB magnets are nested orbit combined correctors for the upgrade of the LHC. The first three magnets were manufactured at CIEMAT and assembled at CERN, in the framework of the HL-LHC project. The power tests performed on the first prototype showed that the behavior when the dipoles were individua...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2022.3175151 http://cds.cern.ch/record/2859854 |
_version_ | 1780977725356376064 |
---|---|
author | Jardim, Carla Martins Alcázar, C Domínguez, M A Durán, O Estévez, A García-Matos, J A García-Tabarés, L González, L Gómez, P Jiménez, J Martínez, L M Martínez, T Pardo, J A Pérez, J M Sobrino, P Toral, F Ferradas, S Fiscarelli, L Guinchard, M Perez, J C Todesco, E Willering, G |
author_facet | Jardim, Carla Martins Alcázar, C Domínguez, M A Durán, O Estévez, A García-Matos, J A García-Tabarés, L González, L Gómez, P Jiménez, J Martínez, L M Martínez, T Pardo, J A Pérez, J M Sobrino, P Toral, F Ferradas, S Fiscarelli, L Guinchard, M Perez, J C Todesco, E Willering, G |
author_sort | Jardim, Carla Martins |
collection | CERN |
description | MCBXFB magnets are nested orbit combined correctors for the upgrade of the LHC. The first three magnets were manufactured at CIEMAT and assembled at CERN, in the framework of the HL-LHC project. The power tests performed on the first prototype showed that the behavior when the dipoles were individually powered was excellent, but the training to reach nominal currents in combined operation was very long. Memory was lost when the torque direction changed. A similar behavior was found in the first power test of the second prototype described elsewhere. The origin of the problem has been identified as insufficient mechanical support at the inner dipole coil ends. This paper depicts the results of the power test after the reassembly of the second magnet with increased prestress on the coils. Shimming plan is discussed. Furthermore, a fine tuning of the inner dipole design has been introduced in the third magnet. The results of the power tests on that magnet show a significant performance improvement. |
id | cern-2859854 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2022 |
record_format | invenio |
spelling | cern-28598542023-06-06T09:20:34Zdoi:10.1109/TASC.2022.3175151http://cds.cern.ch/record/2859854engJardim, Carla MartinsAlcázar, CDomínguez, M ADurán, OEstévez, AGarcía-Matos, J AGarcía-Tabarés, LGonzález, LGómez, PJiménez, JMartínez, L MMartínez, TPardo, J APérez, J MSobrino, PToral, FFerradas, SFiscarelli, LGuinchard, MPerez, J CTodesco, EWillering, GFabrication and Power Test of Last MCBXFB MagnetsAccelerators and Storage RingsMCBXFB magnets are nested orbit combined correctors for the upgrade of the LHC. The first three magnets were manufactured at CIEMAT and assembled at CERN, in the framework of the HL-LHC project. The power tests performed on the first prototype showed that the behavior when the dipoles were individually powered was excellent, but the training to reach nominal currents in combined operation was very long. Memory was lost when the torque direction changed. A similar behavior was found in the first power test of the second prototype described elsewhere. The origin of the problem has been identified as insufficient mechanical support at the inner dipole coil ends. This paper depicts the results of the power test after the reassembly of the second magnet with increased prestress on the coils. Shimming plan is discussed. Furthermore, a fine tuning of the inner dipole design has been introduced in the third magnet. The results of the power tests on that magnet show a significant performance improvement.oai:cds.cern.ch:28598542022 |
spellingShingle | Accelerators and Storage Rings Jardim, Carla Martins Alcázar, C Domínguez, M A Durán, O Estévez, A García-Matos, J A García-Tabarés, L González, L Gómez, P Jiménez, J Martínez, L M Martínez, T Pardo, J A Pérez, J M Sobrino, P Toral, F Ferradas, S Fiscarelli, L Guinchard, M Perez, J C Todesco, E Willering, G Fabrication and Power Test of Last MCBXFB Magnets |
title | Fabrication and Power Test of Last MCBXFB Magnets |
title_full | Fabrication and Power Test of Last MCBXFB Magnets |
title_fullStr | Fabrication and Power Test of Last MCBXFB Magnets |
title_full_unstemmed | Fabrication and Power Test of Last MCBXFB Magnets |
title_short | Fabrication and Power Test of Last MCBXFB Magnets |
title_sort | fabrication and power test of last mcbxfb magnets |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/TASC.2022.3175151 http://cds.cern.ch/record/2859854 |
work_keys_str_mv | AT jardimcarlamartins fabricationandpowertestoflastmcbxfbmagnets AT alcazarc fabricationandpowertestoflastmcbxfbmagnets AT dominguezma fabricationandpowertestoflastmcbxfbmagnets AT durano fabricationandpowertestoflastmcbxfbmagnets AT esteveza fabricationandpowertestoflastmcbxfbmagnets AT garciamatosja fabricationandpowertestoflastmcbxfbmagnets AT garciatabaresl fabricationandpowertestoflastmcbxfbmagnets AT gonzalezl fabricationandpowertestoflastmcbxfbmagnets AT gomezp fabricationandpowertestoflastmcbxfbmagnets AT jimenezj fabricationandpowertestoflastmcbxfbmagnets AT martinezlm fabricationandpowertestoflastmcbxfbmagnets AT martinezt fabricationandpowertestoflastmcbxfbmagnets AT pardoja fabricationandpowertestoflastmcbxfbmagnets AT perezjm fabricationandpowertestoflastmcbxfbmagnets AT sobrinop fabricationandpowertestoflastmcbxfbmagnets AT toralf fabricationandpowertestoflastmcbxfbmagnets AT ferradass fabricationandpowertestoflastmcbxfbmagnets AT fiscarellil fabricationandpowertestoflastmcbxfbmagnets AT guinchardm fabricationandpowertestoflastmcbxfbmagnets AT perezjc fabricationandpowertestoflastmcbxfbmagnets AT todescoe fabricationandpowertestoflastmcbxfbmagnets AT willeringg fabricationandpowertestoflastmcbxfbmagnets |