Commissioning of the LHC Injectors Upgrade fast wire scanners and first experimental results
The LHC Injectors Upgrade (LIU) program included new fast beam wire scanners (BWS) to meet the requirements of the higher brightness and intensity High Luminosity LHC (HL-LHC) beams. Seventeen LIU BWS have been installed during the LHC second long shutdown (LS2) and they are currently used in the da...
Autores principales: | Di Carlo, S, Emery, J, Andreazza, W, Belohrad, D, Esteban Felipe, J C, Goldblatt, A, Gudkov, D, Guerrero, A, Jackson, S, Lacarrere, G O, Martin Nieto, M, Rinaldi, A T, Roncarolo, F, Schillinger, C, Veness, R |
---|---|
Lenguaje: | eng |
Publicado: |
2023
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/j.nima.2023.168328 http://cds.cern.ch/record/2859861 |
Ejemplares similares
-
Commissioning of the LHC Injectors BWS Upgrade
por: Emery, Jonathan, et al.
Publicado: (2021) -
Assessing the Performance of the New Beam Wire Scanners for the CERN LHC Injectors
por: Di Carlo, Salvatore, et al.
Publicado: (2022) -
Installation and Test of Pre-series Wire Scanners for the LHC Injector Upgrade Project at CERN
por: Veness, Raymond, et al.
Publicado: (2017) -
Modular Software Architecture for the New CERN Injector Wire-Scanners
por: Guerrero, Ana, et al.
Publicado: (2022) -
Performance Assessment of Pre-Series Fast Beam Wire Scanner Prototypes for the Upgrade of the CERN LHC Injector Complex
por: Sirvent, Jose, et al.
Publicado: (2018)