Cargando…

Preparing Phase 4 of the n_TOF/CERN facility

After CERN’s Long Shutdown 2, the n_TOF facility infrastructure was largely upgraded. The biggest change is the installation of a new lead spallation target, the performance of which needs to be carefully examined. During Summer 2021, the facility’s two flight paths were characterised in terms of ne...

Descripción completa

Detalles Bibliográficos
Autores principales: Stamati, M E, Patronis, N, Amaducci, S, Bacak, M, Casanovas, A, Infantes, F Garcia, Manna, A, Mengoni, A, Rodriguez, J A Pavon, Rodriquez, A J Praena, Spelta, M
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.12681/hnps.3610
http://cds.cern.ch/record/2861075
_version_ 1780977794500526080
author Stamati, M E
Patronis, N
Amaducci, S
Bacak, M
Casanovas, A
Infantes, F Garcia
Manna, A
Mengoni, A
Rodriguez, J A Pavon
Rodriquez, A J Praena
Spelta, M
author_facet Stamati, M E
Patronis, N
Amaducci, S
Bacak, M
Casanovas, A
Infantes, F Garcia
Manna, A
Mengoni, A
Rodriguez, J A Pavon
Rodriquez, A J Praena
Spelta, M
author_sort Stamati, M E
collection CERN
description After CERN’s Long Shutdown 2, the n_TOF facility infrastructure was largely upgraded. The biggest change is the installation of a new lead spallation target, the performance of which needs to be carefully examined. During Summer 2021, the facility’s two flight paths were characterised in terms of neutron beam energy distribution, profile and resolution. In this work, the characterisation of the facility is described and the first results are given.
id cern-2861075
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28610752023-06-07T18:56:34Zdoi:10.12681/hnps.3610http://cds.cern.ch/record/2861075engStamati, M EPatronis, NAmaducci, SBacak, MCasanovas, AInfantes, F GarciaManna, AMengoni, ARodriguez, J A PavonRodriquez, A J PraenaSpelta, MPreparing Phase 4 of the n_TOF/CERN facilityDetectors and Experimental TechniquesNuclear Physics - ExperimentAfter CERN’s Long Shutdown 2, the n_TOF facility infrastructure was largely upgraded. The biggest change is the installation of a new lead spallation target, the performance of which needs to be carefully examined. During Summer 2021, the facility’s two flight paths were characterised in terms of neutron beam energy distribution, profile and resolution. In this work, the characterisation of the facility is described and the first results are given.oai:cds.cern.ch:28610752022
spellingShingle Detectors and Experimental Techniques
Nuclear Physics - Experiment
Stamati, M E
Patronis, N
Amaducci, S
Bacak, M
Casanovas, A
Infantes, F Garcia
Manna, A
Mengoni, A
Rodriguez, J A Pavon
Rodriquez, A J Praena
Spelta, M
Preparing Phase 4 of the n_TOF/CERN facility
title Preparing Phase 4 of the n_TOF/CERN facility
title_full Preparing Phase 4 of the n_TOF/CERN facility
title_fullStr Preparing Phase 4 of the n_TOF/CERN facility
title_full_unstemmed Preparing Phase 4 of the n_TOF/CERN facility
title_short Preparing Phase 4 of the n_TOF/CERN facility
title_sort preparing phase 4 of the n_tof/cern facility
topic Detectors and Experimental Techniques
Nuclear Physics - Experiment
url https://dx.doi.org/10.12681/hnps.3610
http://cds.cern.ch/record/2861075
work_keys_str_mv AT stamatime preparingphase4ofthentofcernfacility
AT patronisn preparingphase4ofthentofcernfacility
AT amaduccis preparingphase4ofthentofcernfacility
AT bacakm preparingphase4ofthentofcernfacility
AT casanovasa preparingphase4ofthentofcernfacility
AT infantesfgarcia preparingphase4ofthentofcernfacility
AT mannaa preparingphase4ofthentofcernfacility
AT mengonia preparingphase4ofthentofcernfacility
AT rodriguezjapavon preparingphase4ofthentofcernfacility
AT rodriquezajpraena preparingphase4ofthentofcernfacility
AT speltam preparingphase4ofthentofcernfacility