Cargando…

Preparing Phase 4 of the n_TOF/CERN facility

After CERN’s Long Shutdown 2, the n_TOF facility infrastructure was largely upgraded. The biggest change is the installation of a new lead spallation target, the performance of which needs to be carefully examined. During Summer 2021, the facility’s two flight paths were characterised in terms of ne...

Descripción completa

Detalles Bibliográficos
Autores principales: Stamati, M E, Patronis, N, Amaducci, S, Bacak, M, Casanovas, A, Infantes, F Garcia, Manna, A, Mengoni, A, Rodriguez, J A Pavon, Rodriquez, A J Praena, Spelta, M
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.12681/hnps.3610
http://cds.cern.ch/record/2861075

Ejemplares similares