Cargando…
Status report of the n_TOF facility after the 2nd CERN long shutdown period
During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n_TOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experime...
Ejemplares similares
-
First measurement of the $^{94}$Nb($n$,$\gamma$) cross section at the CERN n_TOF facility
por: Balibrea-Correa, J., et al.
Publicado: (2023) -
Advances and new ideas for neutron-capture astrophysics experiments at CERN n_TOF
por: Domingo-Pardo, C., et al.
Publicado: (2022) -
The CERN n TOF NEAR station for astrophysics- and application-related neutron activation measurements
por: Patronis, N., et al.
Publicado: (2022) -
ANEMIAS HEMOLÍTICAS AUTOIMUNES SECUNDÁRIAS À INFECÇÃO PELO SARS-COV-2 E SUAS CARACTERÍSTICAS: REVISÃO DE LITERATURA
por: Batista, A.C.C., et al.
Publicado: (2020) -
Measurement and analysis of $^{155,157}$Gd(n,$\gamma$) from thermal energy to 1 keV
por: Massimi, C, et al.
Publicado: (2020)