Cargando…

Quality assurance for the LHCb RICH upgrade Photon-Detection chain

During the Long Shutdown 2 of the LHC, the LHCb RICH system has undergone an upgrade to implement the LHCb trigger strategy which increased the read-out rate from 1 MHz to 40 MHz. The new challenging operating conditions of the upgraded experiment required the replacement of the Hybrid Photon Detect...

Descripción completa

Detalles Bibliográficos
Autor principal: Giugliano, C
Lenguaje:eng
Publicado: 2023
Materias:
Acceso en línea:https://dx.doi.org/10.1016/j.nima.2023.168436
http://cds.cern.ch/record/2866164
_version_ 1780978083353853952
author Giugliano, C
author_facet Giugliano, C
author_sort Giugliano, C
collection CERN
description During the Long Shutdown 2 of the LHC, the LHCb RICH system has undergone an upgrade to implement the LHCb trigger strategy which increased the read-out rate from 1 MHz to 40 MHz. The new challenging operating conditions of the upgraded experiment required the replacement of the Hybrid Photon Detectors with Multi-Anode Photomultiplier tubes (MaPMT) and the introduction of new customised front-end electronics. The new RICH detectors have a modular design to facilitate maintenance and assembly. The fundamental core element is the Elementary Cell (EC), which is composed of one or four MaPMTs, depending on the type of the MaPMT, and the associated front-end electronics. An overview of the protocols and testing facilities which have been designed and put in place to perform the quality assurance programme is presented. This process lasted more than six years and included the testing and characterisation of the new front-end electronics, the MaPMTs, the ECs, and the photon detector assembly (columns), commissioning, and installation of the columns in the LHCb cavern.
id cern-2866164
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2023
record_format invenio
spelling cern-28661642023-08-15T14:57:20Zdoi:10.1016/j.nima.2023.168436http://cds.cern.ch/record/2866164engGiugliano, CQuality assurance for the LHCb RICH upgrade Photon-Detection chainDetectors and Experimental TechniquesDuring the Long Shutdown 2 of the LHC, the LHCb RICH system has undergone an upgrade to implement the LHCb trigger strategy which increased the read-out rate from 1 MHz to 40 MHz. The new challenging operating conditions of the upgraded experiment required the replacement of the Hybrid Photon Detectors with Multi-Anode Photomultiplier tubes (MaPMT) and the introduction of new customised front-end electronics. The new RICH detectors have a modular design to facilitate maintenance and assembly. The fundamental core element is the Elementary Cell (EC), which is composed of one or four MaPMTs, depending on the type of the MaPMT, and the associated front-end electronics. An overview of the protocols and testing facilities which have been designed and put in place to perform the quality assurance programme is presented. This process lasted more than six years and included the testing and characterisation of the new front-end electronics, the MaPMTs, the ECs, and the photon detector assembly (columns), commissioning, and installation of the columns in the LHCb cavern.oai:cds.cern.ch:28661642023
spellingShingle Detectors and Experimental Techniques
Giugliano, C
Quality assurance for the LHCb RICH upgrade Photon-Detection chain
title Quality assurance for the LHCb RICH upgrade Photon-Detection chain
title_full Quality assurance for the LHCb RICH upgrade Photon-Detection chain
title_fullStr Quality assurance for the LHCb RICH upgrade Photon-Detection chain
title_full_unstemmed Quality assurance for the LHCb RICH upgrade Photon-Detection chain
title_short Quality assurance for the LHCb RICH upgrade Photon-Detection chain
title_sort quality assurance for the lhcb rich upgrade photon-detection chain
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1016/j.nima.2023.168436
http://cds.cern.ch/record/2866164
work_keys_str_mv AT giuglianoc qualityassuranceforthelhcbrichupgradephotondetectionchain