Cargando…
Performances of L1 Jets and MET Trigger in early Run3
This performance note presents a measurement of the performances of the Level 1 Trigger (L1T) system of CMS to identify jets or compute transverse energy sums using 18 /fb integrated luminosity collected by the LHC during the April - June 2023.
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2023
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2868796 |
Sumario: | This performance note presents a measurement of the performances of the
Level 1 Trigger (L1T) system of CMS to identify jets or compute transverse
energy sums using 18 /fb integrated luminosity collected by the LHC during
the April - June 2023. |
---|