Cargando…
Team in charge of the SQXL cold commissioning in the HL-LHC IT String
The cryogenic system of the HL-LHC IT String was successfully cooled (without magnets) for the first time to nominal operating temperatures, with stable Helium II conditions (1.9 K) reached on 25th July. Commissioning operations are planned to continue in the coming days to further assess the operat...
Autor principal: | Cavazza, Marina |
---|---|
Publicado: |
2023
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2869046 |
Ejemplares similares
-
Ongoing HL-LHC activities at SM18
por: Cavazza, Marina, et al.
Publicado: (2023) -
The new HL-LHC surface complex at Point 1
por: Cavazza, Marina
Publicado: (2023) -
The new HL-LHC surface complex and underground galleries at Point 5
por: Cavazza, Marina
Publicado: (2023) -
Contract signature with Linde Kryotechnik for the cryogenics part of the HL-LHC project
por: Cavazza, Marina
Publicado: (2022) -
Completion ceremony of the HL-LHC civil engineering works at Point 1 and Point 5
por: Cavazza, Marina
Publicado: (2023)