Cargando…
PS internal dump S.S. 93
Autor principal: | Szeless, B |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2870781 |
Ejemplares similares
-
PS Internal dumps - S. S. 93: A beam dump will be installed in straight section 93 according to the minutes of the meeting of 14.6.1974 by Ch. Steinbach
por: Szeless, B
Publicado: (1975) -
Impedance Analysis of New PS Internal Dump Design
por: Popovic, Branko, et al.
Publicado: (2018) -
Impedance Compliance Testing for the PS Internal Beam Dump
por: Jhugroo, Dhiren, et al.
Publicado: (2020) -
Notes on the use of remote handling for the proposed S.S. 21 beam dump with implications for future P.S. remote handling trends
por: Horne, R A
Publicado: (1973) -
Proposals for dump and shielding wall cooling in the AA target area
por: Szeless, B
Publicado: (1979)