Cargando…
Electromechanical and mechanical assembly and installation work for the 1987 shutdown of the PS machine
Lenguaje: | eng |
---|---|
Publicado: |
1986
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2871146 |
Ejemplares similares
-
Technical specification - Electromechanical and mechanical assembly and installation work for LIL, EPA, PS and ACOL
por: Lazanski, M
Publicado: (1984) -
Travaux effectues lors du shutdown 1987 sur le systeme de l'aimant principal PS
por: Emery, F
Publicado: (1987) -
List of work to be done during the March - April 1963 shutdown of the P.S.
por: Gouiran, R
Publicado: (1963) -
Software installations on the two PS SUN machines
por: Fuchs, J, et al.
Publicado: (1991) -
Statistics of PS operation 1987
por: Azzoni, G
Publicado: (1988)