Cargando…

ATLAS MDT AMT Simulations for LHC Run3 and HL-LHC

The Large Hadron Collider (LHC) started the Run 3 operation in 2022, and the peak instantaneous luminosity will reach 2.3x10^34 cm^-2s^-1 and the average number of collisions per bunch crossing is expected to be around 60 in 2023. The ATLAS Monitored Drift Tube (MDT) chambers are the main component...

Descripción completa

Detalles Bibliográficos
Autores principales: Ge, Jiajin, Dai, Tiesheng
Lenguaje:eng
Publicado: 2023
Materias:
Acceso en línea:http://cds.cern.ch/record/2873820
_version_ 1780978654003593216
author Ge, Jiajin
Dai, Tiesheng
author_facet Ge, Jiajin
Dai, Tiesheng
author_sort Ge, Jiajin
collection CERN
description The Large Hadron Collider (LHC) started the Run 3 operation in 2022, and the peak instantaneous luminosity will reach 2.3x10^34 cm^-2s^-1 and the average number of collisions per bunch crossing is expected to be around 60 in 2023. The ATLAS Monitored Drift Tube (MDT) chambers are the main component of the precision tracking system in the ATLAS muon spectrometer. It is important to understand any potential issues with the MDT Front-End (FE) readout electronics for an expected level-1 (L1) trigger rate of 98 kHz and a complex dead time of over 4% for Run 3 operations. We use raw data collected in 2022 to emulate the expected hit rates in MDT chambers and perform a realistic simulation on the ATLAS Muon TDC (Time-to-Digital Converter) (AMT) chip with the current configuration. We study the AMT chip performances by analyzing the trigger/L1/readout buffer occupancies and hit loss fractions under different luminosities with L1 rate of 100 kHz by using the Modelsim software. The hit loss fraction of the hottest MDT chamber (BIL3C05) is lower than 5% due to FE readout, even at a luminosity of 5.01 x10^34 cm^s^-1 with a complex dead time of 5% and a L1 rate of 100 kHz, indicating that AMT can operate under Run 3 conditions without problems. The MDT trigger and readout electronics will be replaced for trigger-less readout during High-Luminosity LHC (HL-LHC) runs. We also simulate the AMT behavior in the trigger-less mode up to 7.44x10^34 cm^-2s^-1 and propose possible AMT configurations in case some FE electronics could not be replaced during the long shutdown 3 (LS3).
id cern-2873820
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2023
record_format invenio
spelling cern-28738202023-10-05T22:35:17Zhttp://cds.cern.ch/record/2873820engGe, JiajinDai, TieshengATLAS MDT AMT Simulations for LHC Run3 and HL-LHCParticle Physics - ExperimentThe Large Hadron Collider (LHC) started the Run 3 operation in 2022, and the peak instantaneous luminosity will reach 2.3x10^34 cm^-2s^-1 and the average number of collisions per bunch crossing is expected to be around 60 in 2023. The ATLAS Monitored Drift Tube (MDT) chambers are the main component of the precision tracking system in the ATLAS muon spectrometer. It is important to understand any potential issues with the MDT Front-End (FE) readout electronics for an expected level-1 (L1) trigger rate of 98 kHz and a complex dead time of over 4% for Run 3 operations. We use raw data collected in 2022 to emulate the expected hit rates in MDT chambers and perform a realistic simulation on the ATLAS Muon TDC (Time-to-Digital Converter) (AMT) chip with the current configuration. We study the AMT chip performances by analyzing the trigger/L1/readout buffer occupancies and hit loss fractions under different luminosities with L1 rate of 100 kHz by using the Modelsim software. The hit loss fraction of the hottest MDT chamber (BIL3C05) is lower than 5% due to FE readout, even at a luminosity of 5.01 x10^34 cm^s^-1 with a complex dead time of 5% and a L1 rate of 100 kHz, indicating that AMT can operate under Run 3 conditions without problems. The MDT trigger and readout electronics will be replaced for trigger-less readout during High-Luminosity LHC (HL-LHC) runs. We also simulate the AMT behavior in the trigger-less mode up to 7.44x10^34 cm^-2s^-1 and propose possible AMT configurations in case some FE electronics could not be replaced during the long shutdown 3 (LS3).ATL-DAQ-SLIDE-2023-545oai:cds.cern.ch:28738202023-10-05
spellingShingle Particle Physics - Experiment
Ge, Jiajin
Dai, Tiesheng
ATLAS MDT AMT Simulations for LHC Run3 and HL-LHC
title ATLAS MDT AMT Simulations for LHC Run3 and HL-LHC
title_full ATLAS MDT AMT Simulations for LHC Run3 and HL-LHC
title_fullStr ATLAS MDT AMT Simulations for LHC Run3 and HL-LHC
title_full_unstemmed ATLAS MDT AMT Simulations for LHC Run3 and HL-LHC
title_short ATLAS MDT AMT Simulations for LHC Run3 and HL-LHC
title_sort atlas mdt amt simulations for lhc run3 and hl-lhc
topic Particle Physics - Experiment
url http://cds.cern.ch/record/2873820
work_keys_str_mv AT gejiajin atlasmdtamtsimulationsforlhcrun3andhllhc
AT daitiesheng atlasmdtamtsimulationsforlhcrun3andhllhc