Cargando…

How the discovery of Cold Noise delayed the production of ATLAS ITk strip tracker modules by a year

The construction of the ATLAS strip tracker barrel will require the assembly of 12,000 barrel detector modules over the course of 3.5 years. In 2022, during the module pre-production phase, modules were found to display clusters of noisy channels outside required specifications when tested at operat...

Descripción completa

Detalles Bibliográficos
Autores principales: Dyckes, Ian, Kurth, Matthew Glenn
Lenguaje:eng
Publicado: 2023
Materias:
Acceso en línea:http://cds.cern.ch/record/2875747
Descripción
Sumario:The construction of the ATLAS strip tracker barrel will require the assembly of 12,000 barrel detector modules over the course of 3.5 years. In 2022, during the module pre-production phase, modules were found to display clusters of noisy channels outside required specifications when tested at operating temperatures (-40 ºC), called “Cold Noise”. Extensive investigations into the cause and mechanism of Cold Noise interrupted pre-production and occupied most barrel module assembly sites. This contribution presents an overview of the year-long investigations into Cold Noise, the final identification of the underlying mechanism and necessary changes for the transition to production.