Cargando…
How the discovery of Cold Noise delayed the production of ATLAS ITk strip tracker modules by a year
The construction of the ATLAS strip tracker barrel will require the assembly of 12,000 barrel detector modules over the course of 3.5 years. In 2022, during the module pre-production phase, modules were found to display clusters of noisy channels outside required specifications when tested at operat...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2023
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2875747 |
Sumario: | The construction of the ATLAS strip tracker barrel will require the assembly of 12,000 barrel detector modules over the course of 3.5 years. In 2022, during the module pre-production phase, modules were found to display clusters of noisy channels outside required specifications when tested at operating temperatures (-40 ºC), called “Cold Noise”. Extensive investigations into the cause and mechanism of Cold Noise interrupted pre-production and occupied most barrel module assembly sites. This contribution presents an overview of the year-long investigations into Cold Noise, the final identification of the underlying mechanism and necessary changes for the transition to production. |
---|